Just returned from WDW and saw the construction of a rather semi perm. eight foot fence around the west wing at Contemp. complete with water booms in the lake! Demo nearing? build two DVC resorts at once?
The fence is pretty standard.
But the fact that there are water booms is very intersesting.
The water booms would suggest demolition to me or some rather extensive repair work on the structure of the North Wings.
After reading about the water booms I did a little research and dug up (no pun intended) this old rumor from mouseplanet.com.
Maybe there is still some hope for a CR DVC even if it is on a smaller scale.
From a June 26 rumor:
http://mouseplanet.com/articles.php?art=wd060626mg
............What we've heard is a variation of an even older rumor, that the North Garden Wing of the Contemporary Resort would become a DVC resort. Now, prior rumors had indicated that the South Garden Wing would be converted to DVC lodgings, while still others indicated that a new DVC resort would be built on the current site of the Contemporary's tennis center. The South Garden Wing has already been refurbished into upgraded hotel accommodations. The tennis center is not in danger due to Reedy Creek Improvement District zoning regulations, which preclude new construction that close to the water. In fact, the North Garden Wing location cannot host new construction due to those same rules.
However, refurbishment of the Contemporary Resort is officially scheduled for completion this summer, yet no work has been done to date on the North Garden Wing buildings. The new reports indicate that the North Garden Wing buildings will be gutted down to the steel superstructure. (They can't remove the steel, because then it would be "new construction" and would violate the zoning laws. The old structures would be grandfathered in as existing structures being "renovated.") They'd then add two floors to the top and rebuild the interiors as DVC lodgings.
---------------------------------------
This rumor always made more sense to me than a 14 story modern tower.
I think the timeline would be correct because it will would most likely take a year to gut the existing structure. It might take about 2 more years to add two floors to the top and rebuild the interiors as DVC lodgings.
I do not see a CR DVC being built in stages so I think the timeline might be correct.
Time will tell.
I am still hoping.