I disagree. If that were the case they would have fixed the roof and skipped the paint job. As it is, the paint job makes WoL look practically new again. Really nice job.
And then there is the state of things inside of the pavilion. The work done is like putting lipstick on a pig, it was the bare minimum required to maintain the occupiablity of the building.