janoimagine
Well-Known Member
Chevrolet (rather GM) wont let WDI or TDO do that. They have some pretty top level exec's traveling in from Detroit to see the opening in December. They fronted the capital on this re-fit and have high expectations, they wont let it come online if it's not what was sold to them in Warren.Ooh, good point.
Much like Countdown to Extinction/Dinosaur was never actually finished (supposedly there were a lot of effects/decor built but never installed) it's a possibility that Test Track 2 will also be permanently half-finished.