Now, if they would have added the rumored "Bantha Peoplemover" concept.
Peoplemover moves about 3,600 pph. Assuming this lower ticket level only have a 2 hour wait, that gives us a line of 7,200 people. If there is fast pass, about 3,800. On top of that, people mover holds ~600 people on ride for a total of 4,400 people on ride or in line for Banthamover.
Banthas are slow. They're elephants in costume. People keep mentioning the cut Bantha ride, but they haven't, AFAIK, said what the mechanics of that ride was except a vague "Bantha's pulling carts" IIRC. That would have been an incredibly slow ride with an incredibly low PPH. I've never seen anyone compare the cut Bantha ride to MK's People Mover.
Now, I'm not saying they shouldn't have added more ride capacity in SWL and in DHS, just that the Bantha ride was probably cut for good reasons. Now, a *landspeeder* people mover... that would've been nice.