EpcotServo
Well-Known Member
It can work. They just need small left and right speakers on each seat and a subwoofer under each seat.
*breaks out in Producers-esque song*
They could do it!!!
They could do it!!!
:lol:
It can work. They just need small left and right speakers on each seat and a subwoofer under each seat.
Would this partial track replacement be the addition of banked turns?
It`s a maybe. Again.Is on-board audio off the table?
Holy smokes! I rode the ride for the first time in 6 years last month, and there was something unsettling about the ride (besides the girders in the dark that seemed to threaten to decapitate me) that I simply could not put in words! And it was the lack of banked turns! That is why my neck hurt!
I have doubts that anything major like that will be added during the refurb. Somehow 5 months only seems long enough for cleaning, recalibration, basic maintenance stuff.
I'm keeping my expectations low. Maybe I'll be pleasantly surprised!
Total closure was a bit more than 2 years. Actual work was about 20 months, if I recall correctly.
Total track replacement? Last I heard, no. Partial would be more likely.
I still don't know where some of you are getting your short refurb timeframes from...even the info Steve gave us said LATE 2009. American Idol was supposed to open in LATE 2008 and that turned into Feb of 2009. Kim Possible was supposed to be completely up and running by year end 2008 but it's not QUITE completely open to full capacity yet (atleast I haven't heard anything). April until late 2009 is 8 months at the least...we've already gotten some sites saying atleast 10 months.
Everybody needs to get off that pessimism band wagon that has been rolling through these forums over the past couple weeks!
Unless something has changed since the last info I got, 10 months is the minimum. I see it going a year, easy.April until late 2009 is 8 months at the least...we've already gotten some sites saying atleast 10 months.
Ha! I love that.marni1971 said:It`s a maybe. Again.
Huh?It's about time.. But 5 months?
So true.:lol: Seriously, nothing about this refurb has remained constant...
Huh?
Where is the 5 month thing coming from?
I still don't know where some of you are getting your short refurb timeframes from...even the info Steve gave us said LATE 2009. American Idol was supposed to open in LATE 2008 and that turned into Feb of 2009. Kim Possible was supposed to be completely up and running by year end 2008 but it's not QUITE completely open to full capacity yet (atleast I haven't heard anything). April until late 2009 is 8 months at the least...we've already gotten some sites saying atleast 10 months.
Everybody needs to get off that pessimism band wagon that has been rolling through these forums over the past couple weeks!
It's because people hear what they want to hear. They expect "Walmarting" because we have gotten it so much recently. As soon as 1 person mentioned they expected it to last 6 months or less everyone had to jumped on the bandwagon. It's sad how pessimistic we have become. :brick:
Unless something has changed since the last info I got, 10 months is the minimum. I see it going a year, easy.
It's about time.. But 5 months? isn't that a little on the short side for a coaster? I always thought the rehab of Space Mountain was to be a complete overhaul of the attraction, much like the Paris or Anaheim version. Does anyone else have any thoughts?
Holy smokes! I rode the ride for the first time in 6 years last month, and there was something unsettling about the ride (besides the girders in the dark that seemed to threaten to decapitate me) that I simply could not put in words!
I'm actually against the on ride audio. Just one more thing to break later down the line. Then we'll have a SM Effects Watch thread.
Fix the light issues (as much as they can be), new cars and a little new track would be awesome.
If there's no on-board soundtrack I riot.
Register on WDWMAGIC. This sidebar will go away, and you'll see fewer ads.