7k? thought it was a 4k deck
Garage # 1 the 7000 car garage will be open (ALL of it) the last 5 decks will be poured before the end of August, Garage # 2 that will be built by T-Rex will begin construction 3/15.
7k? thought it was a 5k deck
Then why are they saying "early 2015" on the maps?
its a CYA quote, and and 'added value' quote as well... 'we got it done faster, just for your trip!'Then why are they saying "early 2015" on the maps?
Under promise and over deliver?Then why are they saying "early 2015" on the maps?
We were told the garage had to be open for the holiday season 2014 thus the quick pour schedule. Again what we were told at the pre-pour meeting.
You can see the rolls on the far left of the photo by the fresh pour and there seems to be more rolls of it on top of the finished deck.
What do you mean the last 5 decks still need to be poured? I thought the garage-buildkng was done and they're just working on the insides.Garage # 1 the 4000 car garage will be open (ALL of it) the last 5 decks will be poured before the end of August,
What do you mean the last 5 decks still need to be poured? I thought the garage-buildkng was done and they're just working on the insides.
Then why are they saying "early 2015" on the maps?
Correct.Maybe early 2015 means completely finished including the on-ramp from the highway and all of the landscaping and decorations. They could open the garage at Thanksgiving but still be working on the other things.
You're right. Never noticed that.....thanks!The two outer sections appear to be almost complete, but the middle section still doesn't have all the decks complete. I am not sure where the 5 decks comes from, the middle section still needs it's third deck complete, and will get a 4th. Not sure where the other three are.
waht i would say when he said decks, he meant deck SECTIONS. there was one section of floor 4 incomplete and 4 sections of deck level 5 to work on at that point.
seems silly to me that they appear to be leaving stub columns on the roof for a potential additional deck in the future. rather than simply building it now which would be cheaper and easier
as it seems like it would be impossible/super inconvenient to everyone to shut down the entire garage to add an additional deck in the future, along with the risks that would have that could contribute to a collapse as there have been several parking garages that have collapsed during construction.
I believe the posts you are referring to are for the light poles that will be on top of the roof. If you don't put them on a concrete base, they are too easily damaged by cars and trucks running into them. Surprisingly, put them on a concrete base, and they last much longer!
Register on WDWMAGIC. This sidebar will go away, and you'll see fewer ads.