DisneyParksFan1
Active Member
Yes, it's just a newer, more betterer "Wait Time" clock like they have at all attractions.
Oh I see. Well, that's good.
Yes, it's just a newer, more betterer "Wait Time" clock like they have at all attractions.
What are the works on Soundstage number 1? is that the empty soundstage near Toy Story Mania?
Yes, that is the empty soundstage and part of the area where the Monsters Inc coaster would go. It is currently used as a site for testing the NextGen project. Permits were filed to fix the roof and install a truss, presumably for a curtain.
What is the Indy construction about. Also have a question about the permit for the Space Mountain NGE work?
Thanks!:wave:
i was hoping for some major works though...
Sounds like Citricos and some GF guest rooms are getting new appliances.
Germany is having some repairs done to the facades.
Poly pool is having work done.
"Head to Toe" shop at DHS seeing some updates.
However, most curious is the electrical work being done along the MK Parade Route. Work is specifically being done on the second floor of two Main Street buildings (MO5 and MO7 on the east side of the street), the castle, Hall of Presidents and Pecos Bill.
I can only guess one of three things: flood lights, cameras or sound system. Maybe they've found a few things that need adjusting to properly accommodate a certain loaner parade that may stay longer than its original August 15 check-out date?
Those are some interesting updates, particularly the Germany facade refurb and Magic Kingdom parade adjustments. Rumor has it we're getting a new parade for the 40th Anniversary, so perhaps the adjustments are for that. On top of that, SpectroMagic is supposed to be undergoing refurbishment as the MSEP is performing, so that may be a factor. I wonder why only MO5 and MO7 are getting adjusted, while MO6 and MO8 aren't yet.
I'd also be interested in hearing if other World Showcase pavilions will get refurbished/repaired exteriors like Germany will get.
I wonder if there was specific damage done to Germany, or if they're just next in line to see some care.
Could this possibly be for the new candy store that is replacing the hummel shop?
However, most curious is the electrical work being done along the MK Parade Route. Work is specifically being done on the second floor of two Main Street buildings (MO5 and MO7 on the east side of the street), the castle, Hall of Presidents and Pecos Bill.
I can only guess one of three things: flood lights, cameras or sound system. Maybe they've found a few things that need adjusting to properly accommodate a certain loaner parade that may stay longer than its original August 15 check-out date?
:lol:I can't wait for Spectro to come back all refurbed. Although I'm glad to see MSEP stay longer.I think this hypothesis has been factualized. :lol:
At first I thought it was speakers, but then why only the east side of MSUSA and why the castle (I'm pretty sure it doesn't have any parade speakers on it, since it's too far from the parade route).
I'd also be interested in hearing if other World Showcase pavilions will get refurbished/repaired exteriors like Germany will get.
Two permits filed yesterday by Imagineering for a TTA signage package. The nomenclature on the permit listed it as "PeopleMover", so either it's getting a name change or no one bothered to update the name (more likely).
Paul Chadkin over on Twitter posted this:
I guess they still have surprises up their sleeve!
Register on WDWMAGIC. This sidebar will go away, and you'll see fewer ads.