A dozen?
It shows they are very active then.. it's good sign!
You can notice that they now have ALL the spotlights at the top of the left hand curve working (you can notice as each spotlight create a small dot on the canopy).
Regarding the day time works left to be done, it looks like all the last walls (in the back next to the hangar, new foundations running along the people mover to link with tunnel and the little curved portion in the middle) are only awaiting wooden frame for concrete to be poured.
They left just an opening large enough for vehicle to enter/exit the zone.. after that.. should only be matter to finish the slab of the entire plaza and start the grass and co. before closing the last part of wall. And so, finish the railroad for good.
On the other side at the ride entrance, they are adding plastic parts on sides of the metal white structure of the canopy, which should be the last step before installing the "inside" canopy.. however they take a lot of time doing it.. only few of them have been done so far..
Regarding the small building, they have added couple of layers of sheets (black, white, black again..).
Should be just a matter of installing the cladding/decor to it..
Final is painting and installation of the railing along the paths.
Not sure if there will be adding decorative flooring on top of the slab, as in Shanghai..
It could be done within a few months.. but it is going pretty slow...
What is very worrying is how slow they are working on the Tomorrowland Light & Power building.. Which should be pretty quick now, if it is just a modification of the facade..
Sorry in advance for my vocabulary.. Im a frenchie.