peter11435
Well-Known Member
Large scale construction is basically complete with both attractions in test and adjust mode. The bulk of what remains is painting and landscaping with the installation of additional prefabricated props.From the pics that were posted it looks like it'll be more than 3 months.
Do you know when they are predicting opening?
Memorial Day weekend is the likely grand opening but guests being in the land by early April is very possible.