I can confirm just drove by two minutes ago.It looks like SWL has finally gone vertical.
I can confirm just drove by two minutes ago.It looks like SWL has finally gone vertical.
Yep.If it's in the vicinity of the DHS toll booth (not the World Drive corner) it's show building.
If it's in the vicinity of the DHS toll booth (not the World Drive corner) it's show building.
Can confirm that as well. They also had 5 cranes being used for park construction.Yep, the first piece of steel was up yesterday.
I can confirm just drove by two minutes ago.[/Thanks!!
Its gonna be pretty cool to watch this go up this close. I wonder how long this view will be available, might cause a little congestion eventually.taken this morning
@socal360 on twitter
Ermegerd, guise!!! JT was right! They accelerated and are now less than 4 months behind DL!
I did hear they would actually prefer to open both lands at the same time FWIW. I personally think May 2019 will be a stretch but September could work.
taken this morning
@socal360 on twitter
Its gonna be pretty cool to watch this go up this close. I wonder how long this view will be available, might cause a little congestion eventually.
For some reason this has me way more excited than watching DL's SWL progress. Probably because it actually belongs in DHS.taken this morning
@socal360 on twitter
For some reason this has me way more excited than watching DL's SWL progress. Probably because it actually belongs in DHS.
I have actually been concerned the last couple weeks that the project at DHS could be delayed and possibly canceled. Not sure why but I was. No longer.
Best news this week in what has been an amazing week.
You might be in luck since that is what is called infrastructure and it is what they have been doing since they started, or at least the pipes are all in place and all they have to do is run the actual wires through them.I won't believe it's happening until they install wire for electricity.
You might be in luck since that is what is called infrastructure and it is what they have been doing since they started, or at least the pipes are all in place and all they have to do is run the actual wires through them.
Even a broken clock is right twice a day.Ermegerd, guise!!! JT was right! They accelerated and are now less than 4 months behind DL!
I did hear they would actually prefer to open both lands at the same time FWIW. I personally think May 2019 will be a stretch but September could work.
I won't believe it's happening until they install wire for electricity.
Ermegerd, guise!!! JT was right! They accelerated and are now less than 4 months behind DL!
I did hear they would actually prefer to open both lands at the same time FWIW. I personally think May 2019 will be a stretch but September could work.