SMRT-1
Active Member
*sigh*
A shame, really. They have such the opportunity, here.
Martin did say something about track-SIDE audio, though.:shrug:
Here's to those new urinal cakes in the restrooms!
*sigh*
A shame, really. They have such the opportunity, here.
Martin did say something about track-SIDE audio, though.:shrug:
Hey, I found a video with a testing train on youtube.
http://www.youtube.com/watch?v=1spOLlsm3MY
Its very short but in good quality
Hey, I found a video with a testing train on youtube.
http://www.youtube.com/watch?v=1spOLlsm3MY
Its very short but in good quality
Prefurbs. Is EVERYTHING a prefurb to you? An 8 month closure is not a prefurb.All these months and almost $20 million to put a cover over the queue and add a few section of track? Something doesn't add up here.
I think we are witnessing the mother of all prefurbs.
Time will tell. :king:
Prefurbs. Is EVERYTHING a prefurb to you? An 8 month closure is not a prefurb.
Well, we will have to wait and see. we have herad too many things about this. At this time I am leaning to what Steve has said though.:shrug: Still is a refurb based on what he said. It would enhance the experience.It sure doesn't appear to be a refurb either.
:lol:Here's to those new urinal cakes in the restrooms!
It sure doesn't appear to be a refurb either.
Well, we will have to wait and see. we have herad too many things about this. At this time I am leaning to what Steve has said though.:shrug: Still is a refurb based on what he said. It would enhance the experience.
:lol:
Yeah, seems like Maintenance, to be honest with you.
Extended maintenance
Um how so? Just because they are not changing much compared to what some people wanted (I not being one of them) does not mean its not a refurb. Space Mountain needed maintenance badly, now its getting it. :wave:It sure doesn't appear to be a refurb either.
*sigh*
A shame, really. They have such the opportunity, here.
Martin did say something about track-SIDE audio, though.:shrug:
Prefurbs. Is EVERYTHING a prefurb to you? An 8 month closure is not a prefurb.
Maintenance wise, no....It's a good thing that it's getting it.Yup a complete and utter waste of time.:brick:
.
All these months and almost $20 million to put a cover over the queue and add a few section of track? Something doesn't add up here.
I think we are witnessing the mother of all prefurbs.
Time will tell. :king:
Yup a complete and utter waste of time.:brick:
Dude, he just does it for attention. Ignore his "prefurb" nonsense and it'll go away.
Two steps forward, one step back.
Yup a complete and utter waste of time.:brick:
Dude, he just does it for attention. Ignore his "prefurb" nonsense and it'll go away.
No not just that. The VAST majority of it has been on ride system control.
The end product is going to be:
1. New queue.
2. New ride control swystem which will give it better reliability.
3. Ongoing replacement of portions of track (that has been done over the last few years with the ride operating)
I dont know where you got $20 million from?
Martin said they were upgrading the supports so they would have the option of adding new cars with on-board audio later. Since you have such a knee jerk reaction to the word "prefurb", how would you describe such a two step process?:shrug:
I'd really like to know what Imagineering calls it also. :veryconfu
Register on WDWMAGIC. This sidebar will go away, and you'll see fewer ads.