That's some nice concept art! 2014 is the new projected opening. :/
That's ridiculous. Three plus years from now? Seriously, they just seem to keep moving the timetable on this project back further and further.
That's some nice concept art! 2014 is the new projected opening. :/
That's ridiculous. Three plus years from now? Seriously, they just seem to keep moving the timetable on this project back further and further.
No. The timeframe hasn't changed. People just assumed it would move faster than it is.
This is neither here nor there, because it will never happen, but there were originally plans to add the Matterhorn to the MK. It was slated to be build kind of adjacent to the Small World show building, which is why the Fantasyland skyway station had a chalet feel. It was all supposed to be part of the same complex. The WDW Railroad would have traveled through it, and there would have been a snowy cavern with actual snow.
Of course, this was almost 40 years ago!
i thought the ENTIRE ROJECT was supposed to be completed by winter 2012-early 2013. Now we're hearing 2014 for the mine ride...it's just too far away to even get excited.
Lee, since the Mine Train is a late edition do you know if they would even be ready to start building it if they wanted to? Has all the upfront design and engineering been completed yet?
Dan
How would the railroad go through it. The railroad runs like 200yards behind the skyway building.
I'm trying to figure out how that would work, as between IASW and the railroad is the (large) cast member access area.I think they meant that the railroad would have run through the Matterhorn, not the Skyway station.
wait is this ride really not opening until 2013-2014? Thats really pathetic
Yea its not really pathetic, a little disappointing but not pathetic. I think the problem is that with Potter already open and the FLE was slated to be done 2012/13 and now its 2014 for this. I can see how it could be a bit frustrating.No, it's not pathetic.
I don't understand the rush...:shrug:
Yes. As far as I know, it is ready to begin. The delay can be attributed to:
- The project will come out of the budget for either fiscal 12 or 13, so the check hasn't been written yet.
- There is a TON of outdoor land work yet to be done that relates to BatB and Mermaid. They really have to get all that done before they begin a huge project in the middle of the land.
- Logistically, it would be a huge pain to have so many major projects underway in such a small area.
Another point not yet discussed...
While the coaster is under construction, the pathway back to Mermaid will likely be a dead end. The only construction access to the coaster will be via the road between Mermaid and the tents. That will very possibly block all access to Mermaid from the east, forcing guests to enter and exit the BatB and Mermaid area via the west pathway near Village Haus.
No, it's not pathetic.
I don't understand the rush...:shrug:
The rush is that MK is lacking capacity and are falling way behind every theme park on Earth. That's not even mentioning the fact that their direct competitor down the street will already be hard at work on phase 2 of the wizarding world or something equally amazing.