Permits 2020

przidentkendall

Well-Known Member
Standby for blog posts and youtube videos - BREAKING: Project Nugget coming to MK!

They will be very disappointed when or if they find out what it is. ;)

Damn... and I was just set to do a whole video of idle speculation based on the name meaning a Big Thunder Mountain themed hotel 😂
 
Last edited:

MisterPenguin

Rumormonger
Premium Member
Standby for blog posts and youtube videos - BREAKING: Project Nugget coming to MK!

They will be very disappointed when or if they find out what it is. ;)

I've deduced that "Nugget" is a reference to the Denver Nuggets. Denver is the 'mile high city.' Thus, Project Nugget, whose address is the launch site of the MK fireworks, is a plan by Disney to launch the fireworks a mile high so that people don't have to bunch up to watch them during the pandemic. They can be seen from everywhere. In Orlando.
 

danlb_2000

Well-Known Member
Original Poster
8/4/2020

ANIMAL KINGDOM
561 W SAVANNAH CIR(MORPHO QUICK SERVICE RESTAURANT) - General Construction


8/5/2020

MAGIC KINGDOM
1180 SEVEN SEAS DR(TTC EASTGATE BLDG) - General Construction


8/6/2020

ANIMAL KINGDOM
501 RESTAURANTOSAURUS RD(DINOSAUR) - General Construction

BEACH CLUB
1900 EPCOT RESORTS BLVD(DISNEYS BEACH CLUB DVC) - General Construction

DISNEY SPRINGS
1530 1Q E Buena Vista dr B17-113 (Lovepop) - Retail store build out

EPCOT
2010 AVENUE OF THE STARS(THE LAND) Seasons - Install new power for 2 exhaust fans fed from the emergency power

HOLLYWOOD STUDIOS
900 THEATER OF THE STARS DR(TOWER OF TERROR) - Replace existing fire pump controller with new

MAGIC KINGDOM
1000 TUNNEL WY(FANTASYLAND TUNNEL) - General Construction


8/7/2020

ART OF ANIMATION RESORT
1270 Animation Way (Art of Animation Nemo Pool Equipment) - Pool Heater Replacement

SARATOGA SPRINGS RESORT
1944 BROADWAY(SARATOGA SPRINGS THE SPRINGS BLDG 3500 (3501-3836)) - General Construction


8/10/2020

FOUR SEASONS
Four Seasons Hotel - Fire Alarm Rewire and maintenance

MAGIC KINGDOM
MK Project Nugget Main F-B Electrical, 1440 Floridian Way (Fireworks Launch Area) - Provide labor, material and/or electrical for construction

PORT ORLEANS
2467 SASSAGOULA CIR(PORT ORLEANS RIVERSIDE BLDG 95 PARTERRE PLACE (RM 9501-9532)) - MAU Replacement #1
2467 SASSAGOULA CIR(PORT ORLEANS RIVERSIDE BLDG 95 PARTERRE PLACE (RM 9501-9532)) - MAU Replacement #2
2467 SASSAGOULA CIR(PORT ORLEANS RIVERSIDE BLDG 95 PARTERRE PLACE (RM 9501-9532)) - MAU Replacement #4
2467 SASSAGOULA CIR(PORT ORLEANS RIVERSIDE BLDG 95 PARTERRE PLACE (RM 9501-9532)) - MAU Replacement #3

SARATOGA SPRINGS RESORT
1929 BROADWAY(SARATOGA SPRINGS MAIN BUS STOP) - General Construction


8/11/2020

ANIMAL KINGDOM
495 RAINFOREST RD(MAIN ENTRY OUTPOST SHOP) - General Construction

DISNEY SPRINGS
1504 C01 East Buena Vista Dr (Everglazed Donuts) - Interior build-out, exterior renovation, and exterior trellis

EPCOT
1350 AVENUE OF THE STARS(ENERGY) - Install Reuse Irrigation Line

SOUTH SERVICE AREA
1550 BEAR ISLAND RD(SOUTH SERVICE AREA TREE FARM) - Relocate Electrical Panel FRom existing Power Pole to New Support Rack


8/12/2020

EPCOT
1480 AVENUE OF THE STARS(MEXICO) - Electrical Work

SARATOGA SPRINGS RESORT
2013 AVENUE OF THE PINES #A (SARATOGA SPRINGS GRANDSTAND POOL) - General Construction
2013 AVENUE OF THE PINES(SARATOGA SPRINGS GRANDSTAND POOL) - General Construction
 

MisterPenguin

Rumormonger
Premium Member
Do you know what this is?

Satuli Canteen

1597266943232.png



Proof that Disney considers FoP an E-Ticket. ;)
 

danlb_2000

Well-Known Member
Original Poster

DVCakaCarlF

Well-Known Member
I would assume audio or system upgrades affecting each area...could be part of the new night show for Epcot, so all the systems sync around the lagoon.
 
Top Bottom