The only costing for a comparable WEDway is how much the 1975 single station, 4600ft duel loop track version cost.Any ideas of the cost compared to the gondola?
With inflation this comes to less than 1/5 of the current gondola cost.
It’s worth remembering the more advanced version two planned for LBV was also more expensive. By how much I don’t know.
Last edited: