I was told this by my friend, who is a CM.
He told me that the bridge would be going under construction in Aug, and would be under work for about 2 weeks. During this time, Spectro would be down and DDCT would be altered (it would start on Main Street, run down and around the castle hub, and end on Main Street).
He told me that the bridge would be going under construction in Aug, and would be under work for about 2 weeks. During this time, Spectro would be down and DDCT would be altered (it would start on Main Street, run down and around the castle hub, and end on Main Street).
