Bairstow
Well-Known Member
So... earlier in the thread it was confirmed this is what they do when they are working on the main Carno. Why not bring the ride down for a week to repair it?
Because Animal Kingdom only has 4 real rides. Bringing any of them offline would be a guest satisfaction disaster.
. Is it because it's not a planned thing or just because they truly think that "backup" option is acceptable.HAH!
A bit of both, I assume. Back in 2010 the carnotaurus was down for a scheduled re-skinning. This time it might be an unscheduled malfunction. No idea.
Anyone know how long it'll be like this? Part of me is kind of hoping when we go in December it'll still be setup like this so when everyone looks left I can look straight at the camera and do something goofy. HAH!
No clue, but the previous thread from 2010 indicates that penultimate carnotaurus was down for 2 weeks. This outtage is going on 3 weeks, so who knows.
Does anyone know if the 3 full carnotaurus figures are interchangeable? As in, can they move carno 3 to carno 2 and so forth? I've never heard of the flashing head being used for any spot besides the second-to-last one.
Interesting picture:
This is the final carnotaurus head used during the downhill finale that was added after the ride opened. According to this guy they only had two weeks go build it: http://davesvfx.blogspot.com/2010/10/countdown-to-extinction-dinosaurs-ride.html