Photo update as of Monday, June 25, 2018. Structural steel going in at the restaurant in the center of the lake. The high rise tower under construction is in the background. Note the boardwalk widens halfway out for those who want to "hang out." The boardwalk has been covered with temporary plywood sheets for construction equipment.
View attachment 292228
View attachment 292229
Another boardwalk "platform" at the other end.
View attachment 292230
View attachment 292232
New decorations are being added to the repainted dome over the lobby. The two images on the right still have the paper stencil attached.
View attachment 292233
The columns at the marina building have been repainted to match those at the entrance porte cochere.
View attachment 292234
The 15th floor of the high rise overlooking the porte cochere.
View attachment 292235
The expanded parking lot beyond the original lobby porte cochere is almost finished. Landscaping is going in, and parking space striping is outlined. This area used to be a retention pond.