• The new WDWMAGIC iOS app is here!
    Stay up to date with the latest Disney news, photos, and discussions right from your iPhone. The app is free to download and gives you quick access to news articles, forums, photo galleries, park hours, weather and Lightning Lane pricing. Learn More
  • Happy Holidays from WDWMAGIC

    Wishing you a season filled with warmth, time with the people you care about, and a little extra Disney magic. Thanks for being part of the WDWMAGIC community. We appreciate you reading, sharing, and talking Disney with us all year.

  • Welcome to the WDWMAGIC.COM Forums!
    Please take a look around, and feel free to sign up and join the community.

DAK AVATAR land construction progress

RSoxNo1

Well-Known Member
well if it is the Vekoma PFS, each theater can hold either 90(std) or 160(large). so then we need show cycle time... so we take soarin' for example at just under 5 minutes. so each theater allowing 5 mins for load/unload can run 6 cycles per hour (450 and 800). now there are 4 theaters so the hourly load at full capacity would be around 1800 or 3200.
Cycle time for Soarin' is significantly more than 5 minutes per theater.
 

mikeh

Well-Known Member
Wider view of the turnstiles
NnF7SpD.jpg
 

WDWtraveler

Well-Known Member
Photo update as of Wednesday, Oct 21. While Pizzafari is still closed for refurbishment, the construction fence that surrounded the building and closed off the future pathway to Avatarland is gone now. (See additional photos in the thread for New Table Service dining at Discovery Island).

In the below photo, Pizzafari is on the right. The old pathway to Camp Minnie Mickey is much wider now, with new landscaping and borders along the Pizzafari building. In the background is the construction fence for the Pizzafari addition.

IMG_6665.JPG


View from the back courtyard of Pizzafari (building on the left) towards the main pathway at Discovery Island.

IMG_6666.JPG
 

Register on WDWMAGIC. This sidebar will go away, and you'll see fewer ads.

Back
Top Bottom