AVATAR land construction progress

RSoxNo1

Well-Known Member
well if it is the Vekoma PFS, each theater can hold either 90(std) or 160(large). so then we need show cycle time... so we take soarin' for example at just under 5 minutes. so each theater allowing 5 mins for load/unload can run 6 cycles per hour (450 and 800). now there are 4 theaters so the hourly load at full capacity would be around 1800 or 3200.
Cycle time for Soarin' is significantly more than 5 minutes per theater.
 

mikeh

Well-Known Member
Wider view of the turnstiles
NnF7SpD.jpg
 

WDWtraveler

Well-Known Member
Photo update as of Wednesday, Oct 21. While Pizzafari is still closed for refurbishment, the construction fence that surrounded the building and closed off the future pathway to Avatarland is gone now. (See additional photos in the thread for New Table Service dining at Discovery Island).

In the below photo, Pizzafari is on the right. The old pathway to Camp Minnie Mickey is much wider now, with new landscaping and borders along the Pizzafari building. In the background is the construction fence for the Pizzafari addition.

IMG_6665.JPG


View from the back courtyard of Pizzafari (building on the left) towards the main pathway at Discovery Island.

IMG_6666.JPG
 