DisneyRoy
Well-Known Member
its vertical and has been for about 6 weeks
pretty sure it was this site that had the pics
Thanks. I'll have to try and hunt them down...
its vertical and has been for about 6 weeks
pretty sure it was this site that had the pics
ill see if i can find themThanks. I'll have to try and hunt them down...
late november
i would say by now the building is completely enclosed
I was thinking the same thing. With most of the structures enclosed at this point and the majority of site work done, hopefully 2016 will be pretty much installing details, finishes & landscaping then testing of the rides.i would say by now the building is completely enclosed
my guess is all rock work done by the fallI was thinking the same thing. With most of the structures enclosed at this point and the majority of site work done, hopefully 2016 will be pretty much installing details, finishes & landscaping then testing of the rides.
I swore I read somewhere on the forums that WDI is releasing updated Avatar/Pandora art either today/tonight (not the rivers of light show).
Or I just misread it.
Wow. These guys are flying on that rock work.
im thinking the one we re seeing is taking so long because it has the huge water featureReally? I was just thinking the opposite. I feel like I've been staring at those same structures with that one floating mountain for months with very little change.
Spring.Rock work isn't quick, but they are moving at a normal pace though in my opinion.. Im confident it will most likely be a 2017 opening, but I can't count on a specific season just yet.
Tim any thoughts on the DAK expansion in particular ROL and avatar after seeing it today?Some photos from yesterday:
http://wdwthemeparks.com/news/2016/01/21/animal-kingdom-construction-update-1-21-2016
Register on WDWMAGIC. This sidebar will go away, and you'll see fewer ads.