11/12/2008
Epcot
Replace roof on monorail rectifier building
Replace roof on monorail rectifier building
MK
Replace roof on monorail rectifier building
Expand fire suppression system in Plaza restaurant
Build shroud over control console for carousel
GF
Make duct and piping modifications to buildings 6 and 9
11/13/2008
Poly
Replace leaking exchanger in boiler
Epcot
Replace beauty caps and pressure plates on storefront windows
Install 5 new plasma TVs in character connection
Pressure wash and repaint rock work in Canada
Repaint exterior of Imagination building backstage
Install nw urethane caulking in concrete arond WS lagoon
Remove primer and paint from backstage stairs at the land.
Repaint stairs backstage at the land
MK
Install 1" conduit for Castle LAN
11/18/2008
Paml & Magnolia Golf Course
Bridge repairs
DHS
Replace 3 gas boilers
Replace roof on One Man's Dream building
BB
Replace heater on pump 1
Replace heater on pump 4
DTD
Repare shoreline at rear of RFC
Haines design a T marquee sign
All Star Resorts
Install new cart washer
WoL
Replace carpet with tile
11/19/2008
MK
Replace stage deck
New guard rails at JC
DHS
Bring parade audio room up to code
Install new automatic gates and switches at cast entrance
TS
New support steel above chlorine tanks
PORS
New automatic door and switches
Disney University
New automatic door and switches.
AK
New automatic door and switches at Program building
New automatic door and switches at cast services
Beach Club
Replace airline check in desk
11/20/2008
Contemporary
HVAC u[grades at guard shack
Boardwalk
Replace and relocate exhaust fan at big river grille
MK
Install shroud to cover vending machines at Ferry landing
CBR
Clean existing drains
Epcot
Replace roof on monorail rectifier building
Replace roof on monorail rectifier building
MK
Replace roof on monorail rectifier building
Expand fire suppression system in Plaza restaurant
Build shroud over control console for carousel
GF
Make duct and piping modifications to buildings 6 and 9
11/13/2008
Poly
Replace leaking exchanger in boiler
Epcot
Replace beauty caps and pressure plates on storefront windows
Install 5 new plasma TVs in character connection
Pressure wash and repaint rock work in Canada
Repaint exterior of Imagination building backstage
Install nw urethane caulking in concrete arond WS lagoon
Remove primer and paint from backstage stairs at the land.
Repaint stairs backstage at the land
MK
Install 1" conduit for Castle LAN
11/18/2008
Paml & Magnolia Golf Course
Bridge repairs
DHS
Replace 3 gas boilers
Replace roof on One Man's Dream building
BB
Replace heater on pump 1
Replace heater on pump 4
DTD
Repare shoreline at rear of RFC
Haines design a T marquee sign
All Star Resorts
Install new cart washer
WoL
Replace carpet with tile
11/19/2008
MK
Replace stage deck
New guard rails at JC
DHS
Bring parade audio room up to code
Install new automatic gates and switches at cast entrance
TS
New support steel above chlorine tanks
PORS
New automatic door and switches
Disney University
New automatic door and switches.
AK
New automatic door and switches at Program building
New automatic door and switches at cast services
Beach Club
Replace airline check in desk
11/20/2008
Contemporary
HVAC u[grades at guard shack
Boardwalk
Replace and relocate exhaust fan at big river grille
MK
Install shroud to cover vending machines at Ferry landing
CBR
Clean existing drains