I have been going through the old permits on the Orange County public records sites and came across the permits for Disney Hollywood Studios initial construction. These are interesting because most of them have the performance bond paperwork attached so you can see how much various aspects of the construction cost. The general contractor on the project was Bechtel with a lot of subs named on the various permits.

3/23/1987, PF-001 (Preparation and installation of a construction access road), $649,820.00
3/23/1987, PF-002 (Construction of MGM Studio Tour Project - Cast Center Building), $1,213,306.00
3/23/1987, PF-003 (Disney-MGM Studio Tour Project, Site Grading), $1,175,700.00
3/23/1987, PF-004 (Sound stage foundation and slabs), $351,000.00
3/23/1987, PF-005 (Walt Disney World Company MGM Studio tower project), $3,014,795.00
3/23/1987, PF-006 (Soundstage Structural Steel), $1,259,000.00
3/23/1987, PF-022 (Site development - civil), $5,430,618.00
6/17/1987, Studio Tour Site - PF-008 , $3,877,572.00
6/17/1987, PF-007 (Great Moments foundation work), $494,747.00
6/17/1987, PF-009 (Erection of the chilled water plant), $1,272,024.00
6/17/1987, PF-10 (MGM Tour Project - Sound Stage Completion), $5,493,000.00
6/17/1987, PF-011 (Fully and properly perform and complete the fabrication for the Great Moments structural steel), $768,637.00
11/19/1987, Studio Tour Site - PF-012, $689,000.00
11/19/1987, Studio Tour Site - PF-013, $5,814,482.00
11/19/1987, Studio Tour Site - PF-018, $199,883.00
11/19/1987, Studio Tour Site - PF-019, $424,900.00
11/19/1987, Studio Tour Site - PF-023, $1,245,752.00
11/19/1987, Studio Tour Site - PF-024, $1,250,856.00
11/19/1987, Studio Tour Site - PF-026, $4,845,200.00
2/8/1988, PF-15 Studio Tour Site, $1,569,000.00
2/8/1988, PF-16 Studio Tour Site, $1,300,000.00
2/8/1988, PF-27 Studio Tour Site, $2,604,000.00
2/8/1988, PF-29 Studio Tour Site, $5,172,000
2/8/1988, PF-30 Studio Tour Site, $6,431,000.00
2/8/1988, PF-33 Studio Tour Site, $850,000.00
2/8/1988, PF-44 Studio Tour Site, $942,439.00
2/29/1988, PF-031/032 G Studio Tour Site, $69,200.00
2/29/1988, PF-031/032 N Studio Tour Site, $263,885.00
2/29/1988, PF-031/032 M, $1,207,648.00
2/29/1988, PF-031/032E Sutdio Tour Site, $957,500.00
2/29/1988, PF-031/032 D Studio Tour Site, $1,441,465.00
2/29/1988, PF-031/032 A Studio Tour Site, $920,000.00
2/29/1988, PF-031/032B, $180,000.00
2/29/1988, PF-034 Studio Tour Site, $1,518,000.00
2/29/1988, PF-031/032 H , $969,637.00
4/1/1988, PF-038 simulator/backlot resturant: structural steel, $927,000.00
4/1/1988, PF-017 Studio gate and wall, $445,500.00
6/3/1988, PF-066 - Catastrophe Canyon: Structural steel, $602,310.00
6/3/1988, PF-051 - Drywall: animation/backlot restaurant/simulator/main entrance, $3,408,548.00
6/3/1988, PF-055 - Mechanical: Animation/Main Entrance, $1,325,000.00
6/3/1988, PF-054 - Fireproofing: animation/simulator, $85,200.00
6/3/1988, PF-036 - Area Development: Attractions, $5,624,650.00
6/3/1988, PF-050 - Backlot Restaurant Enclosure, $790,000.00
6/3/1988, PF-031/032Q - Hollywood Blvd & Lake Facilities: Glazing & Storefronts, $425,000.00
6/3/1988, PF-065 - Catastrophe Canyon: Foundations, $371,200.00
6/3/1988, PF-046 - South Lake Seawall, $325,000.00
6/3/1988, PF-031/032T - Hollywood Blvd. & Lake Facilities : Floor Finishes/Tile, $212,370.00
6/3/1988, PF-031/032P - Hollywood Blvd. & Lake Facilities: Paiting/Wall Finishes, $70.966.00
6/3/1988, PF-071 - audio/video theaters: radio tower, $29,900.00
6/3/1988, PF-031/032J - Hollywood Blvd & Lake Facilities: Roofing, $300,463.00
6/3/1988, PF-078 - Steel pylons for Mickey's Kiosk, $128,497.00
6/3/1988, PF-52 - Animation/main entrance : electrical, $1,340,507.00
6/3/1988, PF-056 - Backlot restaurant/w restrooms/simulator: mechanical, $1,586,900.00
6/3/1988, PF-060 - Backlot restaurant: kitchen equipment , $168,799.00
6/3/1988, PF-057 - Animation/Backlot restaurant/simulator/main entrance: roofing, $476,900.00
7/11/1988, PF-28A Themed Graphics (studio side), $58,446.00
7/11/1988, PF-47 Backlot break area: foundations, $920,000.00
7/11/1988, PF-48 Backlot break area: structural steel, $323,740.00
7/11/1988, PF-58 Misc specialties: Hollywood Blvd/main entrance/animation/simulators/backlot resturant/backlot area restrooms, $736,597.00
7/11/1988, PF-59 Finish carpentry & millwork: animation/backlot restaurant/restrooms/simulator/main entrance, $507,688.00
7/11/1988, PF-61 Painting wall finishes: animation/backlot restaurant/restrooms/simulator/main entrance, $297,000.00
7/11/1988, PF-62 Glass/glazing/store fronts: animation/backlot restaurant/restrooms/simulator/main entrance, $333,968.00
7/11/1988, PF-63A Floor/wall finish (resilient tile): animation/backlot restaurant/restroom/simulator, $181,900.00
7/11/1988, PF-63B Floor/wall finished (ceramic tile): animation/backlot restaurant/restrooms/simulator, $176,000.00
7/11/1988, PF-79 Backlot restaurant: exterior ornamentation, $173,000.00
7/11/1988, PF-81 Miscellaneous metals: animation building & simulators, $425,641.00
7/11/1988, PF-53 Electrical: Backlot restaurant/backlot area restrooms/simulators, $830,000.00
10/24/1988, Studio Tour Site - PF-083 Chiller plant: fourth chiller installation, $180,400.00
10/24/1988, Studio Tour Site - PF-045 Studio Tour: Show electrical, $723,000.00
10/24/1988, Studio Tour Site - PF-049 Backlot break area: completion, $1,338,845.00
10/31/1988, Epic Theatre - 88SS-382 Epic Theatre performance area, $1,794,950.00
10/31/1988, Post Prod Add Etc - 88SS-298 Post production additions soundstage dressing room, craft shop additions, $1,749,316.00
12/12/1988, Studio Tour Site - 88SS-463; Studio Tour simulator electrical package, $549,000.00
12/30/1988, Disney Studio Tour Site - 88SS-494, studio tour - tour bridge new acoustical finishes, $31,013.00
12/30/1988, Disney Studio Tour Site - 88SS-464: Studio Tour - Sony radio studio, $930,000.00
12/30/1988, Disney Studio Tour Site - 88SS-453, Studio tour - auction block interiors, $329,217.00
12/30/1988, Disney Studio Tour Site - 88SS-348, Studio tour, center block interiors, $752,151.00
2/16/1989, Sec 36-24-27 Desc Etc Disney Studio Tour Sit - PF-049 Backlot break area: completion, $1,338,845.00
2/16/1989, Sec 36-24-27 Desc Etc Disney Studio Tour Sit - PF-045 Studio Tour: show electrical, $723,000.00
2/16/1989, Sec 36-24-27 Desc Etc Disney Studio Tour Sit - PF-090 trailer site development, $243,000.00
2/16/1989, Sec 36-24-27 Desc Etc Disney Studio Tour Sit - PF-100 Boat Dock, $183,250.00
2/16/1989, Sec 36-24-27 Desc Etc Disney Studio Tour Sit - PF-103 Miscellaneous Roads, $457,666.00
2/16/1989, Sec 36-24-27 Desc Etc Disney Studio Tour Sit - PF-104 Structural steel & handrails - special effects bld., $61,000.00
2/16/1989, Sec 36-24-27 Desc Etc Disney Studio Tour Sit - PF-105 Backlot restaurant roof addition, $124,750.00
2/17/1989, Sec 36-24-27 Desc Etc Disney Studio Tour Sit - PF-088 Main entrance - ornamental metals, $289,760.00
3/15/1989, Sec 36-24-27 Desc Etc Disney Studio Tour Sit - 89SS-055 Office Building No 4, $559,000.00
3/24/1989, Sec 36-24-27 Etc Disney Studio Tour Site - 889SS-047 Sony V.I.P. lounge, $642,592.0
7/6/1989, Sec 36-24-27 Desc Disney Studio Tour Site - 89BB-313; Studio Tour - Installation of uninterruptable power supply at the post production facility, $110,668.00
7/28/1989, Sec 36-24-27 Desc Disney Studio Tour Site - 89DH-344; Studio tour Star Tours expansion of simulator building, $1,223,000.00
11/30/1989, Sec 36-24-27 Des - 89GL-556; Studio tou HVAC Upgrades, $458,330.00
 
Last edited:

Tom

Beta Return
I have been going through the old permits on the Orange County public records sites and came across the permits for Disney Hollywood Studios initial construction. These are interesting because most of them have the performance bond paperwork attached so you can see how much various aspects of the construction cost. The general contractor on the project was Bechtel with a lot of subs named on the various permits.

3/23/1987, PF-001 (Preparation and installation of a construction access road), $649,820.00
3/23/1987, PF-002 (Construction of MGM Studio Tour Project - Cast Center Building), $1,213,306.00
3/23/1987, PF-003 (Disney-MGM Studio Tour Project, Site Grading), $1,175,700.00
3/23/1987, PF-004 (Sound stage foundation and slabs), $351,000.00
3/23/1987, PF-005 (Walt Disney World Company MGM Studio tower project), $3,014,795.00
3/23/1987, PF-006 (Soundstage Structural Steel), $1,259,000.00
3/23/1987, PF-022 (Site development - civil), $5,430,618.00
6/17/1987, Studio Tour Site - PF-008 , $3,877,572.00
6/17/1987, PF-007 (Great Moments foundation work), $494,747.00
6/17/1987, PF-009 (Erection of the chilled water plant), $1,272,024.00
6/17/1987, PF-10 (MGM Tour Project - Sound Stage Completion), $5,493,000.00
6/17/1987, PF-011 (Fully and properly perform and complete the fabrication for the Great Moments structural steel), $768,637.00
11/19/1987, Studio Tour Site - PF-012, $689,000.00
11/19/1987, Studio Tour Site - PF-013, $5,814,482.00
11/19/1987, Studio Tour Site - PF-018, $199,883.00
11/19/1987, Studio Tour Site - PF-019, $424,900.00
11/19/1987, Studio Tour Site - PF-023, $1,245,752.00
11/19/1987, Studio Tour Site - PF-024, $1,250,856.00
11/19/1987, Studio Tour Site - PF-026, $4,845,200.00
2/8/1988, PF-15 Studio Tour Site, $1,569,000.00
2/8/1988, PF-16 Studio Tour Site, $1,300,000.00
2/8/1988, PF-27 Studio Tour Site, $2,604,000.00
2/8/1988, PF-29 Studio Tour Site, $5,172,000
2/8/1988, PF-30 Studio Tour Site, $6,431,000.00
2/8/1988, PF-33 Studio Tour Site, $850,000.00
2/8/1988, PF-44 Studio Tour Site, $942,439.00
2/29/1988, PF-031/032 G Studio Tour Site, $69,200.00
2/29/1988, PF-031/032 N Studio Tour Site, $263,885.00
2/29/1988, PF-031/032 M, $1,207,648.00
2/29/1988, PF-031/032E Sutdio Tour Site, $957,500.00
2/29/1988, PF-031/032 D Studio Tour Site, $1,441,465.00
2/29/1988, PF-031/032 A Studio Tour Site, $920,000.00
2/29/1988, PF-031/032B, $180,000.00
2/29/1988, PF-034 Studio Tour Site, $1,518,000.00
2/29/1988, PF-031/032 H , $969,637.00
4/1/1988, PF-038 simulator/backlot resturant: structural steel, $927,000.00
4/1/1988, PF-017 Studio gate and wall, $445,500.00
6/3/1988, PF-066 - Catastrophe Canyon: Structural steel, $602,310.00
6/3/1988, PF-051 - Drywall: animation/backlot restaurant/simulator/main entrance, $3,408,548.00
6/3/1988, PF-055 - Mechanical: Animation/Main Entrance, $1,325,000.00
6/3/1988, PF-054 - Fireproofing: animation/simulator, $85,200.00
6/3/1988, PF-036 - Area Development: Attractions, $5,624,650.00
6/3/1988, PF-050 - Backlot Restaurant Enclosure, $790,000.00
6/3/1988, PF-031/032Q - Hollywood Blvd & Lake Facilities: Glazing & Storefronts, $425,000.00
6/3/1988, PF-065 - Catastrophe Canyon: Foundations, $371,200.00
6/3/1988, PF-046 - South Lake Seawall, $325,000.00
6/3/1988, PF-031/032T - Hollywood Blvd. & Lake Facilities : Floor Finishes/Tile, $212,370.00
6/3/1988, PF-031/032P - Hollywood Blvd. & Lake Facilities: Paiting/Wall Finishes, $70.966.00
6/3/1988, PF-071 - audio/video theaters: radio tower, $29,900.00
6/3/1988, PF-031/032J - Hollywood Blvd & Lake Facilities: Roofing, $300,463.00
6/3/1988, PF-078 - Steel pylons for Mickey's Kiosk, $128,497.00
6/3/1988, PF-52 - Animation/main entrance : electrical, $1,340,507.00
6/3/1988, PF-056 - Backlot restaurant/w restrooms/simulator: mechanical, $1,586,900.00
6/3/1988, PF-060 - Backlot restaurant: kitchen equipment , $168,799.00
6/3/1988, PF-057 - Animation/Backlot restaurant/simulator/main entrance: roofing, $476,900.00
7/11/1988, PF-28A Themed Graphics (studio side), $58,446.00
7/11/1988, PF-47 Backlot break area: foundations, $920,000.00
7/11/1988, PF-48 Backlot break area: structural steel, $323,740.00
7/11/1988, PF-58 Misc specialties: Hollywood Blvd/main entrance/animation/simulators/backlot resturant/backlot area restrooms, $736,597.00
7/11/1988, PF-59 Finish carpentry & millwork: animation/backlot restaurant/restrooms/simulator/main entrance, $507,688.00
7/11/1988, PF-61 Painting wall finishes: animation/backlot restaurant/restrooms/simulator/main entrance, $297,000.00
7/11/1988, PF-62 Glass/glazing/store fronts: animation/backlot restaurant/restrooms/simulator/main entrance, $333,968.00
7/11/1988, PF-63A Floor/wall finish (resilient tile): animation/backlot restaurant/restroom/simulator, $181,900.00
7/11/1988, PF-63B Floor/wall finished (ceramic tile): animation/backlot restaurant/restrooms/simulator, $176,000.00
7/11/1988, PF-79 Backlot restaurant: exterior ornamentation, $173,000.00
7/11/1988, PF-81 Miscellaneous metals: animation building & simulators, $425,641.00
7/11/1988, PF-53 Electrical: Backlot restaurant/backlot area restrooms/simulators, $830,000.00
10/24/1988, Studio Tour Site - PF-083 Chiller plant: fourth chiller installation, $180,400.00
10/24/1988, Studio Tour Site - PF-045 Studio Tour: Show electrical, $723,000.00
10/24/1988, Studio Tour Site - PF-049 Backlot break area: completion, $1,338,845.00
10/31/1988, Epic Theatre - 88SS-382 Epic Theatre performance area, $1,794,950.00
10/31/1988, Post Prod Add Etc - 88SS-298 Post production additions soundstage dressing room, craft shop additions, $1,749,316.00
12/12/1988, Studio Tour Site - 88SS-463; Studio Tour simulator electrical package, $549,000.00
12/30/1988, Disney Studio Tour Site - 88SS-494, studio tour - tour bridge new acoustical finishes, $31,013.00
12/30/1988, Disney Studio Tour Site - 88SS-464: Studio Tour - Sony radio studio, $930,000.00
12/30/1988, Disney Studio Tour Site - 88SS-453, Studio tour - auction block interiors, $329,217.00
12/30/1988, Disney Studio Tour Site - 88SS-348, Studio tour, center block interiors, $752,151.00
2/16/1989, Sec 36-24-27 Desc Etc Disney Studio Tour Sit - PF-049 Backlot break area: completion, $1,338,845.00
2/16/1989, Sec 36-24-27 Desc Etc Disney Studio Tour Sit - PF-045 Studio Tour: show electrical, $723,000.00
2/16/1989, Sec 36-24-27 Desc Etc Disney Studio Tour Sit - PF-090 trailer site development, $243,000.00
2/16/1989, Sec 36-24-27 Desc Etc Disney Studio Tour Sit - PF-100 Boat Dock, $183,250.00
2/16/1989, Sec 36-24-27 Desc Etc Disney Studio Tour Sit - PF-103 Miscellaneous Roads, $457,666.00
2/16/1989, Sec 36-24-27 Desc Etc Disney Studio Tour Sit - PF-104 Structural steel & handrails - special effects bld., $61,000.00
2/16/1989, Sec 36-24-27 Desc Etc Disney Studio Tour Sit - PF-105 Backlot restaurant roof addition, $124,750.00
2/17/1989, Sec 36-24-27 Desc Etc Disney Studio Tour Sit - PF-088 Main entrance - ornamental metals, $289,760.00
3/15/1989, Sec 36-24-27 Desc Etc Disney Studio Tour Sit - 89SS-055 Office Building No 4, $559,000.00
3/24/1989, Sec 36-24-27 Etc Disney Studio Tour Site - 889SS-047 Sony V.I.P. lounge, $642,592.0
7/6/1989, Sec 36-24-27 Desc Disney Studio Tour Site - 89BB-313; Studio Tour - Installation of uninterruptable power supply at the post production facility, $110,668.00
7/28/1989, Sec 36-24-27 Desc Disney Studio Tour Site - 89DH-344; Studio tour Star Tours expansion of simulator building, $1,223,000.00
11/30/1989, Sec 36-24-27 Des - 89GL-556; Studio tou HVAC Upgrades, $458,330.00

Nice finds!
 

roj2323

Well-Known Member
I have been going through the old permits on the Orange County public records sites and came across the permits for Disney Hollywood Studios initial construction. These are interesting because most of them have the performance bond paperwork attached so you can see how much various aspects of the construction cost. The general contractor on the project was Bechtel with a lot of subs named on the various permits.

3/23/1987, PF-001 (Preparation and installation of a construction access road), $649,820.00
3/23/1987, PF-002 (Construction of MGM Studio Tour Project - Cast Center Building), $1,213,306.00
3/23/1987, PF-003 (Disney-MGM Studio Tour Project, Site Grading), $1,175,700.00
3/23/1987, PF-004 (Sound stage foundation and slabs), $351,000.00
3/23/1987, PF-005 (Walt Disney World Company MGM Studio tower project), $3,014,795.00
3/23/1987, PF-006 (Soundstage Structural Steel), $1,259,000.00
3/23/1987, PF-022 (Site development - civil), $5,430,618.00
6/17/1987, Studio Tour Site - PF-008 , $3,877,572.00
6/17/1987, PF-007 (Great Moments foundation work), $494,747.00
6/17/1987, PF-009 (Erection of the chilled water plant), $1,272,024.00
6/17/1987, PF-10 (MGM Tour Project - Sound Stage Completion), $5,493,000.00
6/17/1987, PF-011 (Fully and properly perform and complete the fabrication for the Great Moments structural steel), $768,637.00
11/19/1987, Studio Tour Site - PF-012, $689,000.00
11/19/1987, Studio Tour Site - PF-013, $5,814,482.00
11/19/1987, Studio Tour Site - PF-018, $199,883.00
11/19/1987, Studio Tour Site - PF-019, $424,900.00
11/19/1987, Studio Tour Site - PF-023, $1,245,752.00
11/19/1987, Studio Tour Site - PF-024, $1,250,856.00
11/19/1987, Studio Tour Site - PF-026, $4,845,200.00
2/8/1988, PF-15 Studio Tour Site, $1,569,000.00
2/8/1988, PF-16 Studio Tour Site, $1,300,000.00
2/8/1988, PF-27 Studio Tour Site, $2,604,000.00
2/8/1988, PF-29 Studio Tour Site, $5,172,000
2/8/1988, PF-30 Studio Tour Site, $6,431,000.00
2/8/1988, PF-33 Studio Tour Site, $850,000.00
2/8/1988, PF-44 Studio Tour Site, $942,439.00
2/29/1988, PF-031/032 G Studio Tour Site, $69,200.00
2/29/1988, PF-031/032 N Studio Tour Site, $263,885.00
2/29/1988, PF-031/032 M, $1,207,648.00
2/29/1988, PF-031/032E Sutdio Tour Site, $957,500.00
2/29/1988, PF-031/032 D Studio Tour Site, $1,441,465.00
2/29/1988, PF-031/032 A Studio Tour Site, $920,000.00
2/29/1988, PF-031/032B, $180,000.00
2/29/1988, PF-034 Studio Tour Site, $1,518,000.00
2/29/1988, PF-031/032 H , $969,637.00
4/1/1988, PF-038 simulator/backlot resturant: structural steel, $927,000.00
4/1/1988, PF-017 Studio gate and wall, $445,500.00
6/3/1988, PF-066 - Catastrophe Canyon: Structural steel, $602,310.00
6/3/1988, PF-051 - Drywall: animation/backlot restaurant/simulator/main entrance, $3,408,548.00
6/3/1988, PF-055 - Mechanical: Animation/Main Entrance, $1,325,000.00
6/3/1988, PF-054 - Fireproofing: animation/simulator, $85,200.00
6/3/1988, PF-036 - Area Development: Attractions, $5,624,650.00
BIG SNIP

Did the math:
$104,196,543.00
 

danlb_2000

Premium Member
Original Poster
Did the math:
$104,196,543.00

Note that this is not the total cost. The permits for Buena Vista Construction, Disney's internal construction company, do not have costs on them. They would be doing a lot of the detail and theme related work, like installing all the show scenes in GMR, so there is likely a good chunk on money there.
 

roj2323

Well-Known Member
Note that this is not the total cost. The permits for Buena Vista Construction, Disney's internal construction company, do not have costs on them. They would be doing a lot of the detail and theme related work, like installing all the show scenes in GMR, so there is likely a good chunk on money there.

I'm well aware I just thought it would be interesting to do the math on the numbers you did find.
 

danlb_2000

Premium Member
Original Poster
Is that AK one for a entire new lane from the toll booth onward?

Here is the map from the permit. The work area is between the lines marked with all the 'L' numbers.

Capture.JPG
 

ABQ

Well-Known Member
Thanks, sort of guessed that's where the work was, but couldn't tell if it was all just repaving or additional lane creation.
 

danlb_2000

Premium Member
Original Poster
Found another historical permit with some costs on it, this one is for construction of the Swan and Dolphin...

Swan:

Roll-Up Doors & Grilles $ 59,511.00
Delivery, Hoisting & Installation of Heroic Swans & Shell Fountains $ 227,500.00
Architectural Graphics $ 54,388.00
Finish Hardware $ 491,000.00
Special Coatings, Painting and Wallcovering $ 816,000.00
Laundry Equipment $ 71,906.00
Delivery, Hoisting & Installation of Heroic Shell Fountains $ 10,550.00
Decorative Lighting $ 444,402.00
Linen and Trash Chutes $ 28,670.00
Area Development - Phase I $ 1,885,308.00
Site Preparation II (Both Hotels) $ 3,995,000.00
Millwork, Architectural, Woodwork, Ornamental Metals & Interior Glass & Glazing $ 1,785,092.00
Unit Masonry $ 667,000.00
Acoustical Ceillings $ 152,000.00
Carpentry, Drywall & Insulation $ 5,952,752.00
Electrical $ 5,219,400.00
Steel Doors & Frames $ 20,000.00
Interior Landscape Planting $ 42,992.00
Food Service Equipment (Both hotels) $ 7,225,000.00
Fountains $ 230,000.00
Exterior Signage $ 119,568.00
Fire Protection $ 800,000.00
Interior Ceramic and Mosaic Tile, Quarry Tile, Stone Pavers, Marble, Granite and Cast Stone $ 1,027,840.00
Sauna Rooms $ 6,530.00
Building Automation & Energy Management $ 345,000.00
Operable Walls $ 570,000.00
Miscellaneous Iron $ 1,075,000.00
Heating, Ventilation & Air Conditioning $ 5,061,355.00
Exterior Wall $ 3,300,000.00
Ballroom Mural Painting $ 113,168.00
Lobby Lounge Murals $ 79,000.00
Spray-On-Fireproofing $ 320,000.00
Elevators & Escalators $ 1,644,033.00
Events Display System $ 36,807.00
Plumbing $ 3,350,000.00
Building Excavation, Foundatins & Superstructure Concrete $ 5,800,000.00
Area Development - Phase II Site Structures $ 1,085,000.00
Irrigation, Sodding & Landscaping $ 1,121,655.00
Structurel Steel and Metal Deck $ 2,022,000.00
Cultured Marble Vanities $ 255,449.00
Exterior Wall Mural Painting $ 69,704.00
Reilient/Wood/Access Flooring & Carpet $ 352,729.00
Toilet Partitions & Accessories $ 122,799.00
Aluminum Windows, Doros, curtain Wall, Storefront & Louvers $ 2,301,921.00
Testing & Inspection $ 99,246.00
Construction Debris Chutes $ 9,750.00
Telephone Equipment & Installation $ 685,575.00
Swimming Pools, Spas & Equipment $ 230,000.00
Membrane Roofing System, Metal Roofing & Membrane Waterproofing $ 1,830,000.00
Total: $ 63,212,600.00

Dolphin:
Audio-Visual $ 1,000,001.00
Roll-Up Doors & Grilles $ 42,489.00
Finish Hardware $ 873,450.00
Laundry Equipment $ 93,372.00
Decrotive Lighting $ 1,689,000.00
Delivery, Hoisting & Installation of the Floral Foundations $ 47,000.00
Structural Steel $ 4,320,000.00
Linen and Trash Chutes $ 26,480.00
Area Development - Phase I, Site Concrete Paving & Lighting $ 3,579,692.00
Site Preperation II (Both hotels) $ 3,995,000.00
Unit Masonry $ 1,415,000.00
Electrical $ 8,795,000.00
Steel Doors & Frames $ 470,000.00
Food Service Equipment $ 7,225,000.00
Fountains $ 455,000.00
Exterior Signage $ 213,664.00
Fire Protection $ 1,980,000.00
Suana Rooms $ 6,880.00
Building Automation & Energy Managem,ent $ 1,964,225.00
Operable Walls $ 920,000.00
Heating, Ventilating & Air Conditiong $ 9,262,500.00
Exterior Wall $ 4,550,000.00
Rough Carpentry, Drywall, Metal Studs & Suspended Ceilings $ 7,664,037.00
Miscellaneous Drywall & Millwork Work $ 4,381,051.00
Spray-On Fireproofing $ 630,000.00
Miscellaneous Iron $ 1,667,337.00
Elevators & Escelators $ 4,573,467.00
Event Display Systems $ 47,497.00
Building Excavaton, Foundations & Superstrucure Concrete $ 12,207,000.00
Area Development - Phase II Site Structures $ 1,100,000.00
Irrigation, Sodding & Landscaping $ 1,904,880.00
Exterio Wall Mural Painting $ 240,156.00
Plumbing $ 7,400,000.00
Aluminum Windows, Doors, Curtain Wall, Storefront & Louvers $ 5,018,079.00
Testing & Inspection $ 192,654.00
Construction Debris Chutes $ 19,200.00
Telephone Equipment & Installation $ 1,047,349.00
Membrane Roofing system, Metal Roofing & Membrane Waterproofing $ 2,350,000.00
Total: $ 103,366,460.00
 

danlb_2000

Premium Member
Original Poster

roj2323

Well-Known Member
Besides the permits I posted in the other thread for Rivers of Light, there was also this one for contractor Balfour Beatty, not sure exactly what it is for.

713, 715 W Savannah Circle - Discovery Island 310 - TSR Pizzafari

We probably shouldn't get to excited about this one, but I will offer it up anyway. The work area is just for the mountain area of the ride and the expiration date is 6/30/2015.

Expedition Everest - General Modifications


it's amazing how they get away with such generic descriptions of the work to be done. Most of the permits i've ever pulled required detailed descriptions or detailed drawings.
 

danlb_2000

Premium Member
Original Poster
it's amazing how they get away with such generic descriptions of the work to be done. Most of the permits i've ever pulled required detailed descriptions or detailed drawings.

Well, these aren't actually permits, they are Notices of Commencement used to indicate that work on a permit is about to begin. The actual permit records are not available on-line.
 

Register on WDWMAGIC. This sidebar will go away, and you'll see fewer ads.