News Tiana's Bayou Adventure - latest details and construction progress

Smiley/OCD

Well-Known Member
I should note that the aforementioned new project manager I referred to is allegedly described as "clueless" by a lot of people who are working on the ride. Having apparently never been involved in a project like this before and with zero understanding of how resource allocation and management works. They only became involved with the project very recently. We shall see. If that rumor Drew heard ends up being correct, it's probably because said manager got their way. Hopefully they did not.

You are indeed correct about this making no sense, it's just that someone new with apparently a lot of power over this project is lacking in sense from what I was told.
oh, Iger hired Chappy back??
 

MerlinTheGoat

Well-Known Member
Watch the big Mardi Gras day thing be an hour long trip report about how Carter and Smith hired a swamp buggy and rode around in it for a month for inspiration. And no updates for the ride itself.

No that isn't a prediction BTW, I've just been way too nice to this project lately and felt the marketing team needed yet another good roasting for how horrible they've handled everything thus far. Hopefully they finally formalize the opening date and give a proper look at the interior.
 

JoeCamel

Well-Known Member
Watch the big Mardi Gras day thing be an hour long trip report about how Carter and Smith hired a swamp buggy and rode around in it for a month for inspiration. And no updates for the ride itself.

No that isn't a prediction BTW, I've just been way too nice to this project lately and felt the marketing team needed yet another good roasting for how horrible they've handled everything thus far. Hopefully they finally formalize the opening date and give a proper look at the interior.
Wait til they fool you and unleash a full Mardi Gras parade fully formed from Tiana's new gate. Oh wait, it's that other company that stores two complete parades just to run during seasonal events......
 

_caleb

Well-Known Member
Watch the big Mardi Gras day thing be an hour long trip report about how Carter and Smith hired a swamp buggy and rode around in it for a month for inspiration. And no updates for the ride itself.

No that isn't a prediction BTW, I've just been way too nice to this project lately and felt the marketing team needed yet another good roasting for how horrible they've handled everything thus far. Hopefully they finally formalize the opening date and give a proper look at the interior.
You’ve been way too nice to the project and thought it needed another good roasting?

Are you under the impression that spreading negativity on these message boards is somehow going to positively influence the project?
 

Vegas Disney Fan

Well-Known Member
A good representation of a humid environment.
Inspired by the Tron canopy. 😉

It’s actually a great design for Florida, not only does it look great but they won’t have to worry about the natural growth likely to happen.

I love how the outside is coming together, minus the mural, gives me hope for the inside, despite my fears from the backstory.
 

MerlinTheGoat

Well-Known Member
I never noticed the moss where the rooves meet. looks good.
I think it's new. I've been watching the mill to see if they planned on adding some of the mossy details from the DL model. If that model is accurate to what they plan to do to WDW (and so far it has been), there's a lot more they still have left to do.

Tianas-Bayou-Adventure_Full_48678.jpg
 

BrerFoxesBayouAdventure

Well-Known Member
A good representation of a humid environment.
How inclusive of them to include representation like that.
This ride has to open by summer. If they open after summer, WDW Pro will have a video ready on the low wait times.
Why does this guy make the same 3 videos about the same 3 topics?
 

Register on WDWMAGIC. This sidebar will go away, and you'll see fewer ads.

Back
Top Bottom