And another tick is heard on Splash Mountain's death clock 

We will always have Tokyo.And another tick is heard on Splash Mountain's death clock![]()
I'm not saying that bad rides don't exist. I'm just saying no one is going into makeing a ride saying we're going to make a bad one. Outside factors such as budget and other limitations can happen. What sounds good in the idea phase won't necessarily work in practice. I'm not a fan of this retheming. I think the sequel angle with Tiana owning a food co-op is a weird premise.And yet, bad rides exist.
Maelstrom needed more ride system work, but still, the point stands. If they are just reskinning AAs, changing set dressings, and doing the exterior work, I guess it’s possible.Maelstrom - Frozen:
March 5 2014- June 21 2016 (844 days)
Splash - PATF:
Jan 31 2023 [Hypothetical] - June 30 2024 (512 days)
Let that sink in. This is most likely going to be done FASTER than FEA. On a much more detailed ride. On a much longer ride. Dear lord.
As easy (and largely correct) as it is to shun book-report rides, you absolutely can do it well, but man, imagine what 2022 WDI would cook up 11 years after The Little Mermaid's book report ride.Of course not. But it boggles my mind that they chose this story. Chapek wants IP but certainly would have accepted a book report ride with “Friends on the Other Side” replacing the Laughin’ Place, which was a no brainer.
Sorry for the tangent, but did y'all know that F&F is now... GOOD?!?!Fast & Furious would like a word
Maelstrom needed more ride system work, but still, the point stands. If they are just reskinning AAs, changing set dressings, and doing the exterior work, I guess it’s possible.
They took the old see-the-movie-about-the-country-which-we-didn't-make-part-of-the-ride theater room into an extended part of the water course. That alone was a major engineering revamp.They also did some some pavilion construction as part of FEA, right? I feel like they did something with the queue that didn't exist before, so it was more than just a retheme of the existing ride.
I don't think you know the meaning of that wordSorry for the tangent, but did y'all know that F&F is now... GOOD?!?!
What if the permit isn’t for the retheme, since there were permits for Blizzard Beach's renovations?
View attachment 672554
This is the adress on the permit? Splash is 1180 Seven Seas Dr, Orlando, FL
Why does everything about this project make me ragefully angry?so that's where the 1899 in the project name came from. I guess the "CY" is "see ya Splash Mountain, it was nice to know you".
Why does everything about this project make me ragefully angry?
If that's the idea then they are pretty petty.so that's where the 1899 in the project name came from. I guess the "CY" is "see ya Splash Mountain, it was nice to know you".
It was a joke. Most likely means Caribbean waY since they're using the site's ID# and not a actual cryptic project name like Delos or TIJ.If that's the idea then they are pretty petty.
I know it was a joke.It was a joke. Most likely means Caribbean waY since they're using the site's ID# and not a actual cryptic project name like Delos or TIJ.