RSoxNo1
Well-Known Member
It`s very possible - if they spent the money to get rid of the maintainence corridor. Of course, they could send SRs with the FPs and have an enhanced merge (or triple gate check) as mentioned above.
The single rider line is great on Test Track, Rock 'n Roller Coaster, and Expedition Everest. Would it also be possible to have the Single rider, or Fastpass lines routed elsewhere so they don't go in that main corridor? How much work was required to reconfigure the Rock 'n Roller Coaster queue?