Photo update as of Thursday, October 17, 2019. An overview of the construction progress at the entrance to Epcot. The new tram turnaround is in the center of the original tram lane, and outside Epcot's entrance and monorail station. The pedestrian walkways from the parking lot are wider and on either side of the tram turnaround.
View attachment 418955
Under the monorail loading platform, the original tram lane has been replaced with a large landscaped area with some new trees. The new tram turnaround area is to the left in this photo. Epcot's entrance is to the right.
View attachment 418956
As viewed from the monorail unloading platform, the original tram loading/unloading area on the lower level will be the new security (bag check) area. The tables for bag checks have already been installed. The large expanse of concrete in the foreground was the original tram turnaround.
View attachment 418957
The original tram turnaround (bounded by the large trees in the background) has been replaced with a large expanse of concrete for guests waiting at the security area. A new walkway extends from the bus transportation area (beyond the large trees) to the security check area in the foreground.
View attachment 418958
As viewed from the monorail exit ramp, this is the new walkway from the bus transportation area leading to the new security check area under the monorail exit.
View attachment 418959