Are you sure about that ? Not arguing, just curious
For a few reasons
1) The new layout will likely need new infrastructure elements ran... so they will have to tear up at least some of the old
2) They won't leave the lights/etc in place.. so that too will require ripping out and replacing/substituting a LOT of places
3) The old foundations need to come out.. and those elevated pads you see in the photos.. so that will have to be pulled out and filled in with something
4) The new layout may possibly call for new surfaces in general... vs the slurry design there now
Put all those things together.. and the difficulty of mixing old and new and looking good.. I think its highly likely they would go 'clean slate' as it will be quicker, cheaper, and more consistent.
They could just replace the panels.. as they already have all the splits everywhere... but given they are getting a whole new design... and lots of new elements to be placed around...
It is kinda curious tho the pad they ripped out they did cleanly tho. I'm genuinely curious to what they do.. should be fun to watch.