Nevermore525
Well-Known Member
RnRC retheme could probably only take a couple of months to at most a year. The ride part itself isn’t that highly themed and shouldn’t take long to tweak. It’s just the pre-show video and other theming in the show space to Muppet-ize things a bit. Hopefully they’ve already filmed a lot of those things or are in process with whatever artists they intend to collaborate with.
That and MV3D can stay open as long as possible even after they break ground on the Monster’s coaster. The exit could become a bottleneck as they wall off Stage 1 and the restaurants, but the could keep it up for a decent length of time. If they wanted to that is.
That and MV3D can stay open as long as possible even after they break ground on the Monster’s coaster. The exit could become a bottleneck as they wall off Stage 1 and the restaurants, but the could keep it up for a decent length of time. If they wanted to that is.