alissafalco
Well-Known Member
Thanks so much!! The grass is almost all done now, it's looking good
Thanks so much!! The grass is almost all done now, it's looking good
I think & hope so too. I love your Avatar that was such a great film!!They really seem to be putting the pedal to the metal with all this progress. I don't like predicting things, but I could imagine soft openings for the ride maybe starting around the debut of the Festival of Fantasy parade around mid-march. Any thoughts?
The grass has little flowers in it which is a nice touch.
And another level of the scaffolding has come down. You can see where hey have patched the holes:
Before:
After:
What was the date of the before picture? It's great that the scaffolds are finally coming down!
It was posted Feb 3.
no, that is from the feb. 14 batch.
the feb. 3 batch had another layer of scaffolding as well. I can't figure out how to insert images from wdwmagic, but you can look at these links:
feb 14 - http://www.wdwmagic.com/attractions...rfs-mine-train-coaster-construction/20359.htm
feb 3 - http://www.wdwmagic.com/attractions...rfs-mine-train-coaster-construction/20285.htm
Do we know if there will be a scene during the second lift, or will it just be a tunnel?
Do we know if there will be a scene during the second lift, or will it just be a tunnel?
Well, one thing we can glean from the start of this video is that there will be at least a 40-second dispatch minimum. From what I can tell there are no cuts at the beginning, so there's 40 seconds between trains.
At one train every 40 seconds, 20 riders per train, that translates to a capacity of 1800 riders per hour.
-Rob
40-seconds is very doable, except for the case of transfers or clean-ups.
Register on WDWMAGIC. This sidebar will go away, and you'll see fewer ads.