Is it getting a new track?
6 months feels like too short to get a full retracking, Nemesis at Alton Towers took 16 months, Incredible Hulk took a year, I think BTM at DL took a year. DLP will (I assume) be draining and refilling the river and that takes a good number of weeks when they can't get cranes to the island etc.

I think at most this will be a thorough refurbishment of the mountain including a full repaint and some selective track replacement as required.
 

walt-e

Member
The latest rumours suggest that the ride will close 2 to 3 years in a row for about 6 months each time to do a phased retracking. The idea behind this phased approach is to avoid having 2 coasters closed at the same time (yes, Space Mountain is also going to close at some point)
 

jmuboy

Well-Known Member
The latest rumours suggest that the ride will close 2 to 3 years in a row for about 6 months each time to do a phased retracking. The idea behind this phased approach is to avoid having 2 coasters closed at the same time (yes, Space Mountain is also going to close at some point)
I just pray the return of the original theme for SPACE MT
 