HOWEVER, Before all of this happens there are other things that need to be taken care of first. First and foremost the Pin trading store needs to be moved. Second the power going to the store and the hat needs to be severed. Once this is done I imagine they will remove the shrubs for fire safety and clear the ground of everything reachable without a man lift or crane including all of the railings and the the weird gold colored curly cues. All of this will take a few days to a week depending on how detailed they are being. (Disney's not known for the expediency)
That's actually what I came into the thread to mention. The box on the paperwork showing the area to be worked on does *not* contain the entire area that the Hat takes up. It also doesn't include all of the curbing and steps around the Hat.
But what it *does* fully include is the store under the Hat. This NoC may just be for Step 1 of the process, which would be to remove everything from the store. We may still see future filings for overall demo of the Hat structure itself.
-Rob