Looks like we might have the first permit for this project. A permit was filed with the South Florida Water Management District today to re-route the canal behind Energy and create two new retention ponds (POND-20 and POND-21). The permit provides the reason for this work as:
"The applicant wishes to reconfigure the existing canal to provide a more-contiguous area for possible future changes to parking capacity and back of house areas. A spur of the existing canal is proposed to be filled so that a more developable area is provided."
It also says:
"The possible future impervious areas were estimated based on manual take-offs of the input received by the applicant. The area where the construction laydown is to be located is assumed to have paved roadways into the area, a number of construction trailers as impervious, and the remainder of area to be gravel."
View attachment 205123
A construction permit was filed for this today. The contractor is Barton Mallow, one of Disney's big project contractors.
"Project S -SWPPP, clearing/grubbing, grading and site capture"
Anyone want to make some guesses on what the project name might stand for?