flyerjab
Well-Known Member
Aha.
I observed earlier proposals for this showed a secondary attraction within the current building. Later revisions omit this for more queue space for a single attraction.
I also commented in the same post of a wider trend for show scene labels to begin with the queue and continue numerically into the ride itself as opposed to being separate.
The someone got their knickers in a twist and started mud slinging.
This got me to thinking. If we really wish to clear up the confusion, why not bring @jt04 in for a free consult. As I understand it, everything is going as he has foreseen. I would love to hear what the voices in his head are telling him regarding this project.