Rob562
Well-Known Member
Phase 1 is a big phase...they're probably just not done filing permits. And it could be that this contractor only has "Beauty and the Beast" land, and another contractor has "Mermaid Land". All the notices filed today were by one contractor.
Also, the bulk of the Little Mermaid attraction area is already a flat, level ground. The Cindy/BATB area has a lot more demolition and ground-leveling to be done first.
(And for those looking through the permits, AG = Ariel's Grotto and SL = Scuttle's Landing...)
-Rob