I am going to use this thread to track the major permits for the DHS Redevelopment.
South Florida Water Management district permits
10/26/2015 – SFMWD - 151026-6 (L402 Basin)
Description: New fireworks launch area west of World Drive including fenced gravel yard, 3 large concrete slabs, 7 small concrete pads, block house building, storage building and access road.
Documents:
Application: http://my.sfwmd.gov/entsb/docdownload?object_id=0900eeea88be09dc
Plans: http://my.sfwmd.gov/entsb/docdownload?object_id=0900eeea88be0991
Engineering Report:
http://my.sfwmd.gov/entsb/docdownload?object_id=0900eeea88be09aa
South Florida Water Management district permits
10/26/2015 – SFMWD - 151026-6 (L402 Basin)
Description: Construction of 38.01 acre storm water pond west of World Drive, parking expansion, entrance ramp from Osceola Parkway, construction access road from World Drive to Cypress Dr.
Dates or Work: January 2016 and be complete in October 2018
Documents:
Application: http://my.sfwmd.gov/entsb/docdownload?object_id=0900eeea88b1fb88
Engineering Report: http://my.sfwmd.gov/entsb/docdownload?object_id=0900eeea88b1fbec
Plans: http://my.sfwmd.gov/entsb/docdownload?object_id=0900eeea88b1fc05
11/25/2015 – SFWMD - 151125-14 (H 1 Site Development)Dates or Work: January 2016 and be complete in October 2018
Documents:
Application: http://my.sfwmd.gov/entsb/docdownload?object_id=0900eeea88b1fb88
Engineering Report: http://my.sfwmd.gov/entsb/docdownload?object_id=0900eeea88b1fbec
Plans: http://my.sfwmd.gov/entsb/docdownload?object_id=0900eeea88b1fc05
Description: New fireworks launch area west of World Drive including fenced gravel yard, 3 large concrete slabs, 7 small concrete pads, block house building, storage building and access road.
Documents:
Application: http://my.sfwmd.gov/entsb/docdownload?object_id=0900eeea88be09dc
Plans: http://my.sfwmd.gov/entsb/docdownload?object_id=0900eeea88be0991
Engineering Report:
http://my.sfwmd.gov/entsb/docdownload?object_id=0900eeea88be09aa
Last edited: