Here are the location numbers I have seen so far for Star Wars Land. My guess is that 1000W is the Streets of America entrance area, 1004 is the battle ride and 1003 is the Falcon ride. Not sure about the others.

375 Cypress Dr Project D - 1000W - Amendment #3 - AD, Grading & Structure Revisions
375 Cypress Dr Project D - 1000W - Amendment #4 - Civil, AD and structural
386 Cypress Dr Project D - 1001 - Package 1 - Foundation & Structural Steel
394 Cypress Dr Project D - 1002 - Package 1 - Foundation & Structural Steel
390 Cypress Dr Project D - 1003 - Package 1 - Foundations
390 Cypress Dr Project D - 1003 - Package 2 - Structual Steel
384 Cypress Dr Project D - 1004 - Package 1 - Foundations
384 Cypress Dr Project D - 1004 - Package 2 - Primary Structurel Steel
384 Cypress Dr Project D - 1004 Amdendment 4 - Completion & DE/RE Package
375 Cypress Dr Project D - 1006W Package 1 - Foudnationa and structural Steel
450 Cypress Dr Project D - Bldg 1008 - Site Prep, Foundations and Structure
 

jt04

Well-Known Member
Here are the location numbers I have seen so far for Star Wars Land. My guess is that 1000W is the Streets of America entrance area, 1004 is the battle ride and 1003 is the Falcon ride. Not sure about the others.

375 Cypress Dr Project D - 1000W - Amendment #3 - AD, Grading & Structure Revisions
375 Cypress Dr Project D - 1000W - Amendment #4 - Civil, AD and structural
386 Cypress Dr Project D - 1001 - Package 1 - Foundation & Structural Steel
394 Cypress Dr Project D - 1002 - Package 1 - Foundation & Structural Steel
390 Cypress Dr Project D - 1003 - Package 1 - Foundations
390 Cypress Dr Project D - 1003 - Package 2 - Structual Steel
384 Cypress Dr Project D - 1004 - Package 1 - Foundations
384 Cypress Dr Project D - 1004 - Package 2 - Primary Structurel Steel
384 Cypress Dr Project D - 1004 Amdendment 4 - Completion & DE/RE Package
375 Cypress Dr Project D - 1006W Package 1 - Foudnationa and structural Steel
450 Cypress Dr Project D - Bldg 1008 - Site Prep, Foundations and Structure

Wow, they are completing amendment 4 already. Nice.
 

trainplane3

Well-Known Member
Since I don't have an account with them, does the permit show details on how the new bus locations will interact with the gondola station and security checkpoint?
In case you didn't know, you don't need an account. Just click the "Acknowledge" button and bam, PDF of the permit.

And for your question, no. It just gives a parcel number, address info, contractor info, who requested it, and who signed off (summing up). It gives you a nice overview of what's going on and expiration dates which can be possibly seen as "completed on or before this" date as well.
 

roj2323

Well-Known Member

WDWtraveler

Well-Known Member
Photo update as of Saturday, June 2 and 9, 2018. I didn't want to start a new thread for a simple, if not lengthy, project.... For a few weeks now, concrete pavement has been removed and the surface is being repaved at Hollywood Studios from in front of the Star Wars: Path of the Jedi small theatre towards the Backlot Express. The area has been "walled off" by movable planter boxes, which necessitated rerouting pedestrian traffic in unusual areas. Today (Saturday. June 9), to get from the main walkway at Indiana Jones to Star Tours, you were directed to walk through part of the queue for Celebrity Spotlight, exiting on the small pathway next to the restrooms.

This area needed to be repaved, as it had been patched many times. June 2, 2018:

IMG_0470.JPG


June 9, 2018:

IMG_0481_1.JPG


IMG_0482_1.JPG
 