AVATAR land construction progress

ABQ

Well-Known Member
It's an entertainment trailer that use to be behind FOLK at Camp Minnie Mickey. Must be coming back in a different location.
Was that the same trailer that led to all the controversy over the soiled costumes and subsequent legal matter?
 

danlb_2000

Premium Member
There was a new permit today for "DAK Expansion - Morpho 800AD Pkg 4". The address is 521 W Savannah Circle which was the address of the old FotLK theater. This permit has the default one year expiration

There was a permit last year that also mentioned 800AD and said it was for the Central Energy Plant, although that was at 467 W Savannah. Since 467 is the lowest number address I have seen it makes sense that the CEP would be at south end of the Avatar plot.
 

flyerjab

Well-Known Member
There was a new permit today for "DAK Expansion - Morpho 800AD Pkg 4". The address is 521 W Savannah Circle which was the address of the old FotLK theater. This permit has the default one year expiration

Some people have hinted that we might see a floating mountain soon. I doubt that is what this is, but maybe more materials to add on to the pre-existing steel skeleton that is currently standing?
 

WDWtraveler

Well-Known Member
Photo update as of Friday, June 19. From the Rainforest Café rear entrance....some significant additions to the steel structures.

IMG_5566.JPG


In addition to the "floating mountain" on the right, a smaller structure on top of the building's flat roof has appeared.

IMG_5567.JPG


Not really exciting, but for those interested.....here is a view from the old walkway to Camp Minnie Mickey, with the construction wall across the walkway, and the back of the Pizzafari building on the right. The restaurant has turned this area into outdoor dining, or a general rest area. A good amount of trees and vegetation has been removed around the old walkway, but a tree line still separates the view to Avatarland.

IMG_5570.JPG
 
Last edited:

articos

Well-Known Member
I've often times thought that one time insiders lose their sources or they are no longer the primary source themselves and then they have to either a) rely on weirdos who don't know what is going on or b) make stuff up.
He knows a lot of people within the company, so he should have good sources. It's odd. Maybe he misunderstood someone's explanation, or maybe he misspoke. Don't know.
 

danlb_2000

Premium Member
Photo update as of Friday, June 19. From the Rainforest Café rear entrance....some significant additions to the steel structures.

View attachment 97656

In addition to the "floating mountain" on the right, a smaller structure on top of the building's flat roof has appeared.

View attachment 97657

Not really exciting, but for those interested.....here is a view from the old walkway to Camp Minnie Mickey, with the construction wall across the walkway, and the back of the Pizzafari building on the right. The restaurant has turned this area into outdoor dining, or a general rest area. A good amount of trees and vegetation has been removed around the old walkway, but a tree line still separates the view to Avatarland.

View attachment 97669

Cool to see the steel on top the show building since that will define the final height and shape of the rockwork that will cover the building.
 

Register on WDWMAGIC. This sidebar will go away, and you'll see fewer ads.

Back
Top Bottom