You should see our rack room. You can tell what was installed on day one by the meticulous Atlanta engineers who built the facility (in the wire chases, nicely arranged, etc)... and what was installed by our last drugged-out engineer (strung across the rack, halfway soldered, etc). I actually have two connections back there right now that are a little square of styrofoam, with the wires taped together with electrical tape. :brick: