JoeCamel
Well-Known Member
The bulk of it will be built off to the side then connected up so it shouldn't disrupt flow much but it is a lot of infrastructure so I would guess 18 months more or so.is there a timeline for this to be finished?
i have a feeling this is going to take FOREVER, since they have to be able to maintain the different flows of traffic during construction.