A South Florida Water Management District permit was filed today for a new storm water retention pond south of the MK parking lot to support World Drive Phase 2 and 3. The permit is not for the actual World Drive projects but does provide some details.
"The project is the Phase 2 extension and realignment of World Drive and the associated ramps and frontage roads. Phase 2 of the World Drive extension will begin where Phase 1 ends near Floridian Way and east of the existing care care center. The end of Phase 2 ties in to Floridian Way approximately 800 feet south of Seven Seas Drive. The total project length is approximately 1.3 miles."
"The World Drive Phase III roadway project (currently under design and proposed for permitting & construction in late 2020) begins at the north end of the World Drive North Phase II project and runs north, passing Seven Seas Drive, running between the Polynesian Resort and Shades of Green and along the Grand Floridian Resort, ending at Maple Road."
The blue lines in this drawing are for Phase 2.
View attachment 368306