More updates for you's guys:
- Carousel of Progress will be going down for a short two or three day refurb sometime in the next couple of months (sooner rather than later). We're going to be changing out some set pieces in the final "modern" scene and also changing out the video game movie which plays on the television.
- Mickey's PhilharMagic will be receiving a significant boost in advertising and space in our material. Hopefully this will counteract our latest study that shows many casual Walt Disney World guests do not recognize Mickey's PhilharMagic as a major attraction, which results in less guests experiencing the attraction. This is also resulting in longer lines for our other attractions in Fantasyland and a waste of our FastPass machines used on that attraction.
- Liberty Inn, a restaurant at the American Pavillion in Epcot's World Showcase, will be receiving a major menu change. At this time, I am unaware of the timeframe for the planned switch, but I can confirm that the menu changes will feature traditional American cuisine items that are often associated with American holidays. Planned menu items include chicken and dumplings, dressing, sweet potato casserole, potato salad, baked beans, etc. Expect the menu prices to increase.
- Toy Story Mania interactive elements have been dramatically improved since I previously told you to expect a delay in the attraction's opening. The attraction will still struggle to open in the timeframe executives had hoped for, but now it appears we're dealing with weeks rather than months. The issue was that the interactive element graphics were not at the level Lassetter (and many others) were expecting.
- The upcoming Big Thunder Mountain Railroad refurbishment will feature a re-do to the queue line. We're also replacing several parts in the falling boulder rooms along with replacing the pipes and spouts which release the waterfalls. A new chain lift system has been planned to go into Big Thunder, which will quiet the lift noise. However, the chain lifts are not planned to be replaced in this refurbishment which means BTMR will receive a second refurbishment sometime after the October downtime (my guess is early spring).
Have fun and salt your news / rumors for added flavor...
- Carousel of Progress will be going down for a short two or three day refurb sometime in the next couple of months (sooner rather than later). We're going to be changing out some set pieces in the final "modern" scene and also changing out the video game movie which plays on the television.
- Mickey's PhilharMagic will be receiving a significant boost in advertising and space in our material. Hopefully this will counteract our latest study that shows many casual Walt Disney World guests do not recognize Mickey's PhilharMagic as a major attraction, which results in less guests experiencing the attraction. This is also resulting in longer lines for our other attractions in Fantasyland and a waste of our FastPass machines used on that attraction.
- Liberty Inn, a restaurant at the American Pavillion in Epcot's World Showcase, will be receiving a major menu change. At this time, I am unaware of the timeframe for the planned switch, but I can confirm that the menu changes will feature traditional American cuisine items that are often associated with American holidays. Planned menu items include chicken and dumplings, dressing, sweet potato casserole, potato salad, baked beans, etc. Expect the menu prices to increase.
- Toy Story Mania interactive elements have been dramatically improved since I previously told you to expect a delay in the attraction's opening. The attraction will still struggle to open in the timeframe executives had hoped for, but now it appears we're dealing with weeks rather than months. The issue was that the interactive element graphics were not at the level Lassetter (and many others) were expecting.
- The upcoming Big Thunder Mountain Railroad refurbishment will feature a re-do to the queue line. We're also replacing several parts in the falling boulder rooms along with replacing the pipes and spouts which release the waterfalls. A new chain lift system has been planned to go into Big Thunder, which will quiet the lift noise. However, the chain lifts are not planned to be replaced in this refurbishment which means BTMR will receive a second refurbishment sometime after the October downtime (my guess is early spring).
Have fun and salt your news / rumors for added flavor...