But the art shows no one leaving down that ram... OMG!! IT'S A TRAP!!!!You enter and exit from the same ramp. The path that passes underneath the flyover is only a path to Storybook, nothing else.
But the art shows no one leaving down that ram... OMG!! IT'S A TRAP!!!!You enter and exit from the same ramp. The path that passes underneath the flyover is only a path to Storybook, nothing else.
I thought that they put those little smoke pellets in the smoke stack to make smoke!!I thought they were converted to do away with the smoke years ago?
They banned smoking. The train has to go outside the park if it wants to smoke.I thought that the put these little smoke pellets in the smoke stack to make smoke!!
I always thought this but now that it's laid bare...oof.
New video from Disney on upcoming ride testing -
As long as they don't use the oil from the fried fishMy suggestion for fueling diesel engines has been and still is to use the proven technology of recycled vegetable oil. So, the exhaust smells like French fries what's wrong with that?
No. they have this girl employed to just sit inside the stack all day.I thought that the put these little smoke pellets in the smoke stack to make smoke!!
Needs Botox.
Yes. The ride is almost done. It‘s simply a question of when they want it open. If GotG is delayed from May, this will certainly delay into 2023.So this sounds like they have finished installing the show sets and are ready to do clearance checks.
This isn't the first time. There were pictures of a clearance check car on the outdoor track previously checking clearances of the ride envelope with the building and infrastructure.
They do but refine it enough so it doesn't smell too muchMy suggestion for fueling diesel engines has been and still is to use the proven technology of recycled vegetable oil. So, the exhaust smells like French fries what's wrong with that?
No. they have this girl employed to just sit inside the stack all day.
![]()
The original concept art showed that the slope leading up from the speedway to the walkway next to the Power building was being removed and a vertical retaining wall being built in its place which would have widen the pathway by about 10'. For some reason they didn't build it. When the speedway was down for having the track shortened several years ago, that would have been the time to do it.
Removed to save money? Issue's with guests dropping things over the side onto the racers?
Are you including the breakdown every 11 minutes?Don't know if anyone would care but I randomly decided to do some math and found out that you could ride the TTA Peoplemover roughly 214,728 times from the start of TRON's construction until now and the ride still ain't completed. This means you could pass by the construction site 214,728 times on TTA and still not see the finished result!
WDI with a new close-up video -
*Edited to add a new link as Disney deleted and reposted -
Wait what-She saw the original Tron Shanghai when she was 8 and joined the intern team when she was 12. She's now 35 and almost done working on a clone of a pre designed roller coaster that's taken half a decade to build.
Glad she's excited, hopefully she'll see the finished product before she cashes out her Disney 401k.
That would certainly put a dent in those calculations, LOLAre you including the breakdown every 11 minutes?
Glad I wasn’t the only one confused by that timeline. Groundbreaking on Shanghai DL was 10 years ago, I was wondering how she saw it 27 years ago, maybe they meant the movie rather than the ride?Wait what-
Yeah I'm sure they meant the movie lol. I had to do a lot of mental gymnastics to try to comprehend that timelineGlad I wasn’t the only one confused by that timeline. Groundbreaking on Shanghai DL was 10 years ago, I was wondering how she saw it 27 years ago, maybe they meant the movie rather than the ride?
Register on WDWMAGIC. This sidebar will go away, and you'll see fewer ads.