danlb_2000
Premium Member
Hmmmm... Six show scenes in the remodeled Maelstrom? 6 Minute tourism film removed? 6 hour wait to ride? Average number of 101's per day? Number of complaints per hour? Number of standby line folks allowed on per hour? Number of projection effects per show scene? Number of actual AAs in the entire attraction? Number of melt downs per hour for children standing in line? Number of boats in attraction show rooms at 1 time? Number of beers I will need to drink to brave the standby line? Number of trips to the bathroom I'll make while waiting in the standby line? Number of times I'll chastise myself for waiting in line? Number of times I'll here let it go while on the ride? Number of actual changes they will make load/unload area? Number of heat strokes per day from standing in line for attraction? Number of times people will try getting in front of me in line while I wait? Number of drinks I will need after I get off the attraction? Number of hours of therapy I'll need after waiting and riding on the attraction? Number of times my niece will want to ride this attraction per day? Number of Olafs that will be guiding me through the attraction scenes? Number of interactive queue areas in the line? Number of communicable diseases you can get from the interactive items in the line? Number of times my foot will be stepped on while waiting in line? Number of years this will have as a popular attraction? Number of cast members needed to operate this attraction? The gallons of water each boat will take on per circuit?......
*1023*
You have far to much time on your hands.