TrainsOfDisney
Well-Known Member
I was told by a few of the train engineers at Main Street that all the ties are being replaced with new concrete ties. Since the train is being moved, the work from Main Street, through Frontierland, and onto Fantasyland, must be completed. When I was there in November, the train had been stranded in the Main Street station as portions had not been finished. The slight grade between Fantasyland and Main Street was also supposed to be addressed during this downtime. If it hasn't happened yet, it will probably be worked on when the rail bed and ties are reinstalled through the TRON site.
Concrete ties would be a very odd choice for this railroad, might even be the first narrow gauge railroad to ever get them. While anything is possible, I would doubt it.
How do you address a grade? It was already pretty gradual.. you still have to get from fantasyland up to Main Street!