Voxel
President of Progress City
Waiting music
Random fact of the day. This band does not have a set number of members and have any where from 7 to 15 people preforming. They also do not practice, their shows are their practice time.
Waiting music
I knew it was going to be this, and I've gotta say, this is MY CHALLENGE!!!! I'm stoked!!!!--Session 3: Once Upon A Moonage Dream--
Concept Creation Challenge
What made Disneyland special was how it created quality attractions and experiences that the family can enjoy together. One of the most classic styles of rides that fans cherish today are the old, storytelling Fantasyland dark rides, and your next mission of Project Revival involves bringing these back!
For your third concept creation challenge in your two teams, you must design a new, IP based Fantasyland-style dark ride for Disneyland.
The only caveat here though is that the new dark ride may not be located in Fantasyland; it has to go in any other land of the park.
As I'm sure you all remember, Team Baby Groot has won an advantage in this next CC challenge after winning the previous one. For their advantage, they have the option of designing the dark ride for either park, DL or DCA. Team Drax is only allowed to put their dark ride in Disneyland park (again, anywhere other than Fantasyland).
If you have any questions on what is being asked of - you can post them to the main thread here or ask your coaches in the team brainstorming PMs.
Similar to last round, here are the options for your due date:
Sunday January 22nd or Monday January 23rd
5:00 PM, 7:00PM, 9:00PM, 11:59PM EST
You may discuss with your teams what works best for everyone, and this post will be edited later with the final deadline.
Good Luck teams!
Based on preorders not the case, and preorder stock is pretty much all goneI missed it. I decided I needed sleep . I'm hoping that they can keep up with stock.
I'm hoping this doesn't become the case either. . Time will tell luckily I'm moving in March so I probably won't need to get one until April.Based on preorders not the case, and preorder stock is pretty much all gone
This was within a 12 hour period from the livestream btw.
Hopefully we don't run into a similar situation that fell upon the NES Classic were stock v demand were imbalanced, and now we have NES Classic being sold from anywhere to 100 dollars (if lucky) to I believe I saw once 500 dollars. Luckily my mom had an insider at Toys'R'Us, and he was able to get one for her for Christmas for me. Although tbh this is the first time my mom has ever played a console, and she's probably played more than I have.
I mean there's not even that many games at launch. There's Just Dance 2017, 1 2 Switch, LoZ:BotW, and one more game I can't remember. I would like it on launch, but knowing my mom she'll wait till my birthday in April to give it to me. Acting like she did all she could like the first time with the NES, and of course I believed her because pretty much almost no one got one. However I would like it for MArio Kart 8 Deluxe which comes out a week or so after my birthday which offers a great way to past time in Engineering. I mean we already play games like BS, Blackjack, 2Way Spit, 3Way Spit, Tongues, Spoons, Assassin, Mafia, President, Insult, Slapjack, Nervous, Squares, and our favorite The Sims 4 where we're on the constant quest to get all the deaths so far we only need the emotional ones. As you can tell Engineering is a very busy class.I'm hoping this doesn't become the case either. . Time will tell luckily I'm moving in March so I probably won't need to get one until April.
What year is this supposed to be set in? Opening day is a massive difference than adding one even in the 70's. And obviously today. Great challenge idea BTW!--Session 3: Once Upon A Moonage Dream--
Concept Creation Challenge
What made Disneyland special was how it created quality attractions and experiences that the family can enjoy together. One of the most classic styles of rides that fans cherish today are the old, storytelling Fantasyland dark rides, and your next mission of Project Revival involves bringing these back!
For your third concept creation challenge in your two teams, you must design a new, IP based c-ticket Fantasyland-style dark ride for Disneyland.
The only caveat here though is that the new dark ride may not be located in Fantasyland; it has to go in any other land of the park.
As I'm sure you all remember, Team Baby Groot has won an advantage in this next CC challenge after winning the previous one. For their advantage, they have the option of designing the dark ride for either park, DL or DCA. Team Drax is only allowed to put their dark ride in Disneyland park (again, anywhere other than Fantasyland).
If you have any questions on what is being asked of - you can post them to the main thread here or ask your coaches in the team brainstorming PMs.
Similar to last round, here are the options for your due date:
Sunday January 22nd or Monday January 23rd
5:00 PM, 7:00PM, 9:00PM, 11:59PM EST
You may discuss with your teams what works best for everyone, and this post will be edited later with the final deadline.
Good Luck teams!
What year is this supposed to be set in? Opening day is a massive difference than adding one even in the 70's. And obviously today. Great challenge idea BTW!
Thanks!
I believe current day
For the advantage, we will choose Disneyland!For their advantage, they have the option of designing the dark ride for either park, DL or DCA.
I got extremely lucky and ordered at 6 pm on Friday. Online said it was all sold out, but I called my local GameStop and asked if they had any left, turns out that they did. Probably because I'm in Canada, it was easier to get my hands on one...but it costs me in extra $100!!!Based on preorders not the case, and preorder stock is pretty much all gone
This was within a 12 hour period from the livestream btw.
Hopefully we don't run into a similar situation that fell upon the NES Classic were stock v demand were imbalanced, and now we have NES Classic being sold from anywhere to 100 dollars (if lucky) to I believe I saw once 500 dollars. Luckily my mom had an insider at Toys'R'Us, and he was able to get one for her for Christmas for me. Although tbh this is the first time my mom has ever played a console, and she's probably played more than I have.
Launch is very slim, and the other game is Super Bomberman R. All I need is BotW, and then I might get MK8 Deluxe in the spring (this is a hard decision because I already on it on Wii U, but it was my favourite Mario kart). The Odyssey trailer blew me away, and convinced me on the spot that I needed the system, didn't matter the cost. @Voxel I'll tell you what I think of the system on March 3 .I mean there's not even that many games at launch. There's Just Dance 2017, 1 2 Switch, LoZ:BotW, and one more game I can't remember. I would like it on launch, but knowing my mom she'll wait till my birthday in April to give it to me. Acting like she did all she could like the first time with the NES, and of course I believed her because pretty much almost no one got one. However I would like it for MArio Kart 8 Deluxe which comes out a week or so after my birthday which offers a great way to past time in Engineering. I mean we already play games like BS, Blackjack, 2Way Spit, 3Way Spit, Tongues, Spoons, Assassin, Mafia, President, Insult, Slapjack, Nervous, Squares, and our favorite The Sims 4 where we're on the constant quest to get all the deaths so far we only need the emotional ones. As you can tell Engineering is a very busy class.
Register on WDWMAGIC. This sidebar will go away, and you'll see fewer ads.