DaddyGrant
Member
That actually makes a lot of sense. If I remember correctly there were a few High voltage boxes and transformers in that area.
Correct. A lot of that is what was holding up much of the demo. Rerouting power and other utilities that feed other parts of the park out of demo zones before actually doing the demo.