GiveMeTheMusic
Well-Known Member
I'm having a tough time visualizing this. So somewhere after the Train goes thru Splash Mountain it will cross the river at some point past hungry bear I'm assuming. And it will go over the water on some bridge? How tall would this bridge have to be for the Mark twain / Columbia to go under it. So this doesn't sound right to me.
I was assuming the river would start to turn somewhere past critter country and wrap around the front half of TSI. Meaning the river would be substantially cut and the DLRR Would still be traveling on land albeit new land where the back half of TSI and ROA are currently.
That sounds more likely - I can't imagine a bridge situation that would accommodate the Twain and Columbia.