As you all know, Splash Mountain will be down the 17th and 18th of November. The reason being, They will be testing and if all goes right, installing a new magnetic brake for drop 4 (The main 52ft drop you see). Apparently, if the E-Stop is pressed while the log is falling, the log does not stop until the ending stretch (Which they know it takes that long, but for improved safety they want to try to slow it down as much as possible). So let's say some guest decides to randomly go into the underground briar patch tunnel, they wont (more than likely) be squashed by the log. (Or whatever story you'd like to come up with.)
Yesterday (Thursday, November 10th) Disney was doing some E-stop testing, so I figure the 17th-18th will be the days they will be installing the new system.
I don't think they will be slowing down the logs any (Which could make an even more intense drop!), because they need to get those logs down and out of drop 4 as soon as possible so the next log can go, So they don't cascade.
Anyways. 1st post. Yay! :wave:
(FYI: I'm no newbie, I've been reading these forums for about a year now. I've seen everything. haha)
Yesterday (Thursday, November 10th) Disney was doing some E-stop testing, so I figure the 17th-18th will be the days they will be installing the new system.
I don't think they will be slowing down the logs any (Which could make an even more intense drop!), because they need to get those logs down and out of drop 4 as soon as possible so the next log can go, So they don't cascade.
Anyways. 1st post. Yay! :wave:
(FYI: I'm no newbie, I've been reading these forums for about a year now. I've seen everything. haha)