jayhawkmickey
Well-Known Member
OK. I've tried to find the info out there on the web and on this thread but I've got nada. How much does a monorail line cost just for infrastructure aka the precast concrete, three new stations, and control systems? Disney already owns the land which in Vegas and other cities is a huge investment along with moving the infrastructure that's already there. Using the EPCOT station as a transfer to north-south from east-west lines would shave millions for new stations and the DD, HS, and AK stations could drop lower to the ground to save on the costs of a fully elevated station. I know that the hotels will never be served by a new line directly, but the park to park travel would be dramaticly easier and would add just a little more cool factor to the "world". The inflated financial numbers just don't apply to a place where the land for the rails is already owned by the opperator and the build site is wide open over most of the tracks path. Please enlighten me with some firm numbers on material and labor costs for a monorail system. Oh P.S. run the rails down the edges of the highways since they are already compacted to an extent and served by electrical and easily accesed for maint.:shrug: