PERMITS

Disney Irish

Premium Member
Those are moving into POTC.

Muppet_Treasure_Island_pdp.jpg

As long as we get a Tim Curry AA, I'm all for it....
 

SSG

Well-Known Member
Original Poster
BLD2018-01150 Status: Incomplete Map Info: 1313 S DISNEYLAND DR (Mickey and Friends Parking Structure) Description: Electrical for L.E.D. fixture change out.

BLD2018-01149 Electrical for service of "GOOFY'S KITCHEN."
 

SSG

Well-Known Member
Original Poster
BLD2018-01151 Electrical to support - DCA - Paradise Pier Enhancements - Food Carts / Turkey Leg Building - Non Residential Addition. REF: BLD2018-00430

BLD2018-01153 Electrical to support - DCA - Paradise Pier Enhancements - Tenant Improvement. REF: BLD2018-00431

BLD2018-01154 Electrical to support - DCA - Paradise Pier Enhancements - 503 / Coaster - Restaurant, Merchandise and Ice Cream buildings - Tenant Improvement. REF: BLD2018-00442
 

Hatbox Ghostbuster

Well-Known Member
I hadn't checked this for a couple of weeks but the status is now 'Issued.'

Permit Number: BLD2017-05054 Status: Issued Map Info: 1554 S DISNEYLAND DR
Description: DTD - Esplanade/West Plaza - Site Improvements underground utilities electrical 600 amp/120v subpanel, 150 kva transformer and a pour-in-place pad and water line for future building.

Name: MC DONALD'S CORP
Address: 1554 S DISNEYLAND
Received Date: 11/08/2017
Parcel: 08219026
Plan Check Date:
Issue Date: 03/01/2018
Expiration Date: 03/01/2019
Finaled Date:
So...if I'm reading this correctly...DTD is getting a McDonalds??
 

SSG

Well-Known Member
Original Poster
A few out today. FYI Building D is the old Build-a-Bear /Ridemakerz space

BLD2018-01193 Disney - Fontierland - Tom Sawyer Island, Ice House - Tenant Improvement: 140 s.ft new roof framing with built up roof.

BLD2018-01208 DCA - Hollywoodland - Hyperion Theater - ENGAGE Event 04/18/18 - Temporary Use: (2) stages (2) truss arches (4) truss towers all on ballast. Pemit. (Install on 04/15/18 and remove 04/19/18)

BLD2018-01202 DTD - Building D, Suite 203 - Tenant Improvement: Removal of interior non-load bearing walls, electrical, plumbing and mechanical to existing merchandise shop, for future tenant.
 

Ismael Flores

Well-Known Member
I would imagine Pixar Fest kickoff on April 13th. Likely a press event preview on the 12th, per the usual timeline for those things.

Leave it to Disney to host a press event for a 10 year old day parade, a 3 year old night parade, and reworked fireworks.

I wonder if they will use this Press event to expand a bit more on the Marvel construction as well as the soon to be ground breaking for the new hotel? Disney will already have the Press which they will pamper with food and wine, might as well take advantage and get that extra media coverage for upcoming developments.
 

SSG

Well-Known Member
Original Poster
BLD2018-01229Disney - Cleo Parking Structure - Block Wall: 202 ln.ft x 8' high equipmet enclosure.

BLD2018-01230Disney - Cleo Parking Structure - Switch station no.13 includes (5) swith gears with prefabricated vaults to support equipment.
 